| S.No |
Tender Date |
Subject |
Tender No. |
Closing
Date
|
| 198. |
31st May, 2008 |
Annual Maintenance Contract For Cisco Router
For Fibcom NMS At INFO HUB, NOIDA |
GAIL/NOIDA/8014/3300024946/ |
1400 (IST) on 24th June, 2008 |
| 197. |
31st May, 2008 |
Vanishing Blind Vertical type of thick cloth / Nylon i.e.
good quality |
BCPL/C&P/2008/M/02/AB |
1500 (IST) on 10th June, 2008 |
| 196. |
31st May, 2008 |
Split AC, Cap. 2T, Make: Carrier, Godrej, Hitachi, Kenstar,
LG, Samsung, Voltas, Whirlpool or any other reputed make. |
BCPL/C&P/2008/C/02/AB |
1500 (IST) on 10th June, 2008 |
| 195. |
31st May, 2008 |
For Repairing Of Plant Drain At GAIL, Pata Plant. |
GAIL/PATA/C&P/20017380/SKG/08 |
1500 (IST) on 20th June, 2008 |
| 194. |
31st May, 2008 |
For Differential Pressure Transmitter |
GAIL/PR20015475/3200043922/JHA/50/07 |
1400 (IST) on 20th June, 2008 |
| -- |
-- |
Amendment No. 1 |
GAIL/PR20015475/3200043922/JHA/50/07 |
1400 (IST) on 27th June, 2008 |
| 193. |
31st May, 2008 |
Supply of Molecular Sieves |
GAIL/PATA/C&P/20017724/SD |
1200 (IST) on 01st July, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PATA/C&P/20017724/SD |
1200 (IST) on 22nd July, 2008 |
| -- |
-- |
Corrigendum No.2 |
GAIL/PATA/C&P/20017724/SD |
1500 (IST) on 12nd August, 2008 |
| -- |
-- |
Corrigendum No.3 |
GAIL/PATA/C&P/20017724/SD |
1500 (IST) on 12nd August, 2008 |
| 192. |
30th May, 2008 |
Procurement Of Carbon Steel
Bare / Coating / Coated Line Pipes |
BID DOCUMENT NO.: 11/0230/JPK/GAIL /01-R0 |
1500 (IST) on 15th July, 2008 |
| -- |
-- |
Corrigendum No.1 |
BID DOCUMENT NO.: 11/0230/JPK/GAIL /01-R0 |
1500 (IST) on 15th July, 2008 |
| -- |
-- |
Corrigendum No.2 |
BID DOCUMENT NO.: 11/0230/JPK/GAIL /01-R0 |
1500 (IST) on 15th July, 2008 |
| 191. |
30th May, 2008 |
Painting of KG Basin Terminal Piping,
Chinchinada Bridge Pipeline And U/G Hot-tap
Sections And Sectionalising Valves |
GAIL/08/RJ18767/3300024928/ |
1400 (IST) on 20th June, 2008 |
| 190. |
30th May, 2008 |
For Vibration monitoring of Rotating Equipments Installed in all units of VSPL |
GAIL/VIZ/018330/3300024929/SG/ |
1400 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VIZ/018330/3300024929/SG/ |
1400 (IST) on 27th June, 2008 |
| 189. |
30th May, 2008 |
For Printing and Supply of Fire & Safety Control Room Documents |
GAIL/US/08/P016/3200043916/FL-032/08-09 |
1400 (IST) on 20th June, 2008 |
| 188. |
30th May, 2008 |
Engagement of Legal Consultant for Turkmenistan-Afghanistan-Pakistan-
India Pipeline Project |
GAIL/ND/BD-C&P/PC8001/20018595 |
1400 (IST) on 27th June, 2008 |
| 187. |
30th May, 2008 |
Contract Services For Hiring Of Vehicles For Dadri Bawana
Pipeline Project Of GAIL |
BIDDING DOCUMENT NO.8000000413 |
1400 (IST) on 23rd June, 2008 |
| -- |
-- |
Corrigendum No.1 |
BIDDING DOCUMENT NO.8000000413 |
1400 (IST) on 08th July, 2008 |
| -- |
-- |
Corrigendum No.2 |
BIDDING DOCUMENT NO.8000000413 |
1400 (IST) on 08th July, 2008 |
| 186. |
29th May, 2008 |
Procurement of LT Cable for EOL Terminal for GAIL-EOL LPG P/L Connectivity at Jamnagar
|
Bid Document No. 05/51/23KF(EOL)/GAIL/073(LT Cable) |
1500 (IST) on 12th June, 2008 |
| 185. |
29th May, 2008 |
Supply of Computer consumables at GAIL Lakwa |
GAIL/LAK/AB/08
/3200043893/C&P/BIS/08 |
1400 (IST) on 17th June, 2008 |
| 184. |
29th May, 2008 |
Hiring of Vehicles(i.e Scorpio-DI Or Innova(E-Diesel)
and Tata Indica DLS V2 ) of Model January 2008
Onwards for NCR Pipeline work |
GAIL/PARC/C&P/PROJ-CONST/SR-20018715/08-09/AD |
1400 (IST) on 20th June, 2008 |
| -- |
-- |
Addendum No. 1 |
GAIL/PARC/C&P/PROJ-CONST/SR-20018715/08-09/AD |
1400 (IST) on 20th June, 2008 |
| 183. |
29th May, 2008 |
Hiring of Tata Indica Model January 2008
Onwards for S&LR DEPT
|
GAIL/PARC/C&P/S&LR/SR-20018718/08-09/AD |
1400 (IST) on 13th June, 2008 |
| 182. |
29th May, 2008 |
Procurement of UPS System for LPG P/L of GAIL-EOL Connectivity at Jamnagar
|
Bid Document No: 05/51/23KF(EOL)/GAIL/071 |
1500 (IST) on 12th June, 2008 |
| 181. |
29th May, 2008 |
For Storage of Solvex - GL at GAIL Lakwa. |
GAIL/LA/C&P/188/3300024918/MECH/ASB/ |
1400 (IST) on 17th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/LA/C&P/188/3300024918/MECH/ASB/ |
1400 (IST) on 24th June, 2008 |
| 180. |
29th May, 2008 |
Procurement of Safety Equipments & Spares for Fire Fighting Equipments at GPU, GAIL(India)Ltd., Gandhar |
GAIL/GA/2K8007/3200043905/C&P/F&S/Y/ |
1400 (IST) on 19th June, 2008 |
| 179. |
29th May, 2008 |
Procurement of Aqueous Film Forming Foam (AFFF) at GPU, GAIL(India)Ltd., Gandhar |
GAIL/GA/2K8006/3200043885/C&P/F&S/Y/ |
1400 (IST) on 19th June, 2008 |
| 178. |
29th May, 2008 |
Sale of Scrap At GAIL Cauvery Basin, Pondicherry |
GAIL/PY/C&P/SCRAP/FL-001/07-08 |
1500 (IST) on 25th June, 2008 |
| 177. |
29th May, 2008 |
Supply of DI-METHYL DI-SULPHIDE (DMDS), Quantity: 32 MT |
GAIL/PA08/16310/3200043874/SD |
1500 (IST) on 17th June, 2008 |
| 176. |
28th May, 2008 |
Hiring Of Vehicles For GAIL(INDIA)LIMITED,GAIL-TEL
Gwalior & Bhopal Region |
GAIL/VH/08/C049/3300024906/HRM |
1400 (IST) on 18th June, 2008 |
| 175. |
28th May, 2008 |
Service Contract for Bagging and Palletinzing Operation in Both Old & New HDPE Bagging Unit at GAIL, PATA |
GAIL/PATA/C&P/PSER/20017337/SR |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/PSER/20017337/SR |
1500 (IST) on 27th June, 2008 |
| 174. |
28th May, 2008 |
For Hiring of vehicle[LMV-Tavera/Toyota Innova]for
48"Vijaypur-Dadri Upgradation Project |
GAIL/VH/08/C037/3300024894/CONST |
1400 (IST) on 18th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VH/08/C037/3300024894/CONST |
1400 (IST) on 02nd July, 2008 |
| 173. |
28th May, 2008 |
For Telephone Instruments |
GAIL/ND/08/0010/3200043851/C&P/2001713 |
1400 (IST) on 12th June, 2008 |
| 172. |
27th May, 2008 |
Procurement of Split Air Conditioners |
GAIL/AUR/18103/3200043852/SD |
1500 (IST) on 20th June, 2008 |
| 171. |
27th May, 2008 |
Procurment Of Spares For Mather & Platt Make Pumps Installed In New HDPE Plant |
GAIL/PA07/15558/3200043842/RDB |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PA07/15558/3200043842/RDB |
1500 (IST) on 29th July, 2008 |
| 170. |
27th May, 2008 |
For Rate Contract For Transportation Of Naphtha (Local Movement Up To
50 Km). |
GAIL/PATA/C&P/20017929/SKG/08 |
1500 (IST) on 17th June, 2008 |
| 169. |
27th May, 2008 |
For Repair of Rolls Royce Make Gas Generator (Model: 501-kc5) Sl. No. ASP 1917 Lying At GAIL, Hazira, Distt. Surat, Gujarat |
GAIL/VH/08/I015/3300024886/MECH-HAZ |
1400 (IST) on 08th July, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VH/08/I015/3300024886/MECH-HAZ |
1400 (IST) on 30th July, 2008 |
| 168. |
27th May, 2008 |
Procurement of Resuscitator |
GAIL/AG/08/0005/3200043853/JBS/C&P/ |
1400 (IST) on 20th June, 2008 |
| 167. |
27th May, 2008 |
For Rate Contract For Transportation of Naphtha From Pata To M/S HPL,
Haldia |
GAIL/PATA/C&P/20018762/SKG/08 |
1500 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/20018762/SKG/08 |
1500 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/PATA/C&P/20018762/SKG/08 |
1500 (IST) on 31th May, 2008 |
| 166. |
26th May, 2008 |
Procurement of Batteries |
GAIL/US/08/P015/3200043824/FL-028/08-09 |
1400 (IST) on 17th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/US/08/P015/3200043824/FL-028/08-09 |
1400 (IST) on 04th July, 2008 |
| 165. |
26th May, 2008 |
For Capacitor Units. |
GAIL/US/08/P014/3200043816/FL-027/08-09 |
1400 (IST) on 17th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/US/08/P014/3200043816/FL-027/08-09 |
1400 (IST) on 11th July, 2008 |
| 164. |
26th May, 2008 |
Procurement of Bearings at GPU, GAIL(India)Ltd., at Gandhar |
GAIL/GA/2K8003/3200043832/C&P/M/YS/ |
1400 (IST) on 12th June, 2008 |
| 163. |
26th May, 2008 |
Supply of Valve Keys |
GAIL/PA08/17973/3200043817/SD |
1500 (IST) on 17th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/17973/3200043817/SD |
1500 (IST) on 08th July, 2008 |
| 162. |
24th May, 2008 |
Calibration Of Master Instruments,Barometers
And RTD For GAIL MUMBAI |
GAIL/MU/07/C048/3300024860/ |
1400 (IST) on 20th June, 2008 |
| 161. |
24th May, 2008 |
For Insulation & Refractory Work Of Boiler At Gail Lpg Usar |
GAIL/US/08/W008/3300024861/FL-31/08-09 |
1400 (IST) on 12th June, 2008 |
| 160. |
24th May, 2008 |
For Hiring of Buses For LPG Recovery Plant Lakwa, CISF & School
Duty. |
GAIL/LAKWA/C&P/HR/20017906/183 |
1400 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/LAKWA/C&P/HR/20017906/183 |
1400 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/LAKWA/C&P/HR/20017906/183 |
1400 (IST) on 13th June, 2008 |
| 159. |
24th May, 2008 |
Procurement of Photocopier machines on by back basis. |
GAIL/PATA/C&P/20017896/18002/16506/
/3200043649/SKG |
1500 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/20017896/18002/16506/
/3200043649/SKG |
1500 (IST) on 08th July, 2008 |
| 158. |
23rd May, 2008 |
Finishing renewal of non plant buildings of LPG/GREP area at
GAIL , Vaghodia. |
GAIL/VAG/15804/3300024858/W-2007056 |
1400 (IST) on 18th June, 2008 |
| 157. |
23rd May, 2008 |
Printing and Supply of Log Book & Registers of GAIL, Pata. |
GAIL/PA08/15926/3200043535/SKG |
1500 (IST) on 13th June, 2008 |
| 156. |
23rd May, 2008 |
For Transportation of Chemical from GAIL PATA (U.P.) to M/s APPL Gurgaon
& M/s KLJ Polymer, Silvassa |
GAIL/PA08/17105&17920/3300024836/SD |
1500 (IST) on 17th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/17105&17920/3300024836/SD |
1500 (IST) on 04th July, 2008 |
| 155. |
23rd May, 2008 |
For Maintenance Contract of Video Conference System |
GAIL/ND/C&P/BIS/C - 2802/3300024834 |
1400 (IST) on 16th June, 2008 |
| 154. |
23rd May, 2008 |
Handheld Mobile Device |
GAIL/ND/08003
/3200043768/C&P/20018436 |
1400 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/ND/08003
/3200043768/C&P/20018436 |
1400 (IST) on 27th June, 2008 |
| 153. |
22th May, 2008 |
Turbine Gas |
GAIL/LAK/SD/07
/3200043766/C&P/ME/08-09 |
1400 (IST) on 17th June, 2008 |
| 152. |
22th May, 2008 |
For Material Handling Contract At GAIL LPG USAR
|
GAIL/US/08/W007/3300024807/FL-22/08-09 |
1400 (IST) on 12th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/US/08/W007/3300024807/FL-22/08-09 |
1400 (IST) on 20th June, 2008 |
| 151. |
22th May, 2008 |
Hiring of PMC services for Bawana Tap off to Nangal Pipeline Project
|
BIDDING DOCUMENT NO:8000000404 |
1400 (IST) on 02nd July, 2008 |
| -- |
-- |
Reply To Bidder's Queries |
BIDDING DOCUMENT NO:8000000404 |
1400 (IST) on 02nd July, 2008 |
| 150. |
22th May, 2008 |
For Service Contract for Cleaning of Raw Water Reservoir at GAIL, PATA.
|
GAIL/PATA/C&P/PSER/20017673/SR(IOP&S) |
1500 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/PSER/20017673/SR(IOP&S) |
1500 (IST) on 13th June, 2008 |
| 149. |
22th May, 2008 |
For Annual Maintenance Contract of Digital & Mechanical Weighing Machine at GAIL, PATA.
|
GAIL/PATA/C&P/PSER/20018009/SR |
1500 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/PSER/20018009/SR |
1500 (IST) on 13th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/PATA/C&P/PSER/20018009/SR |
1500 (IST) on 04th July, 2008 |
| 148. |
22th May, 2008 |
For Printing Of Safet Boards On Flax Sheet At JAMNAGAR DT |
GAIL/JA/07/RS25/3300024816/RC/2008-09 |
1400 (IST) on 13th June, 2008 |
| 147. |
22th May, 2008 |
Procurement of Files & Envelops |
GAIL/AG/08/0004/3200043776/JBS/C&P/ |
1400 (IST) on 06th June, 2008 |
| 146. |
22th May, 2008 |
Hiring Of Project Management Consultancy (PMC)
Services For Proposed Jhajjar-hissar Pipeline
Project. |
BIDDING DOCUMENT NO:8000000405 |
1500 (IST) on 02nd July, 2008 |
| -- |
-- |
Reply To Bidder's Queries |
BIDDING DOCUMENT NO:8000000405 |
1500 (IST) on 02nd July, 2008 |
| 145. |
22th May, 2008 |
Construction of Boundary Wall Around Kabristan at Saraiya Tanker Parking Area
at GAIL Pata. |
GAIL/PATA/C&P/20017913/SK/08 |
1500 (IST) on 13th June, 2008 |
| 144. |
22th May, 2008 |
Annual Maintenance Contract of Electrical
System At GTI, NOIDA |
GAIL/GTI/C&P/2K08-09/2008 |
1400 (IST) on 12th June, 2008 |
| 143. |
21th May, 2008 |
Procurement of Dew Point Moisture Analyser |
GAIL/HZR/FL-P17/3200043747/AMT |
1400 (IST) on 18th June, 2008 |
| 142. |
21th May, 2008 |
For Integrated Management System Audit For Compressor Station, Dibiyapur |
GAIL/AUR/16548/3100000009/SD/20016548 |
1500 (IST) on 13th June, 2008 |
| 141. |
21th May, 2008 |
Supply of Turbine Cleaning Chemical at GAIL (India) Ltd., Gas Processing Unit, Gandhar (Gujarat)- India |
GAIL/GA/2K8002/3200043735/C&P/M/SP |
1400 (IST) on 19th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/GA/2K8002/3200043735/C&P/M/SP |
1400 (IST) on 08th July, 2008 |
| 140. |
21th May, 2008 |
Tag and details |
GAIL/08/RJ18622/3200043728/ |
1400 (IST) on 09th June, 2008 |
| 139. |
21th May, 2008 |
For Procurement Of Nominal Valve |
GAIL/BDA/08/014/3200043745/ID/08 |
1400 (IST) on 10th June, 2008 |
| 138. |
21th May, 2008 |
For Printing and Supply of Log Book & Registers of GAIL, Pata. |
GAIL/PA08/15926/3200043705/SKG |
1500 (IST) on 10th June, 2008 |
| 137. |
21th May, 2008 |
Procurement Of Filter Cartridges |
GAIL/BDA/08/015/3200043723/ID/05 |
1400 (IST) on 10th June, 2008 |
| 136. |
20th May, 2008 |
Contract For Hydrotesting of Linepipes Of 30 & 36
Inch Dia For About 100 Mtrs. |
GAIL/HZR/FL-C13/3300024783/AMT |
1400 (IST) on 18th June, 2008 |
| 135. |
20th May, 2008 |
For Interconnection Of Gas Line Network At Hazira |
GAIL/HZR/FL-C12/3300024771/AMT |
1400 (IST) on 18th June, 2008 |
| 134. |
20th May, 2008 |
For Oil Filtration For Power Transformers At Jamnagar DT |
GAIL/JA/08/RS05/3300024805/RC/2008-09 |
1400 (IST) on 13th June, 2008 |
| 133. |
20th May, 2008 |
Supply Of Digital Energy Meters |
GAIL/PATA/C&P/PR 20017376/NM |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/PR 20017376/NM |
1500 (IST) on 01st July, 2008 |
| 132. |
20th May, 2008 |
Supply of Ericsson Analog Cards |
GAIL/PATA/C&P/PR 20017243/NM |
1500 (IST) on 20th June, 2008 |
| 131. |
20th May, 2008 |
Supply of Hoses |
GAIL/PA08/13768/3200043717/SD |
1500 (IST) on 10th June, 2008 |
| 130. |
20th May, 2008 |
For Mechanical Seal At GAIL VAGHODIA |
GAIL/VAGH\18623/3200043718/C&P\LPG\IMEC |
1400 (IST) on 04th June, 2008 |
| 129. |
20th May, 2008 |
For Procurement of Ball Valve At GAIL, VAGHODIA- INDIA
|
GAIL/VAG/C&P/17986/CWH/MECH/2007 |
1400 (IST) on 25th June, 2008 |
| 128. |
19th May, 2008 |
For Air Conditioning System for Control Room Building at EOL Despatch Terminal, Jamnagar
|
BID DOCUMENT NO: 05/51/23KF(EOL)/GAIL/001/AC |
1500 (IST) on 02nd June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
BID DOCUMENT NO: 05/51/23KF(EOL)/GAIL/001/AC |
1500 (IST) on 13th June, 2008 |
| 127. |
19th May, 2008 |
For Metering Skids For Sriram Fertilizers, Kota - Vijaipur |
Bid Document No:05/51/23KF(SRI RAM - VIJAIPUR)/GAIL/030A |
1500 (IST) on 10th June, 2008 |
| -- |
-- |
Addendum No. 1 |
Bid Document No:05/51/23KF(SRI RAM - VIJAIPUR)/GAIL/030A |
1500 (IST) on 10th June, 2008 |
| -- |
-- |
Addendum No. 2 |
Bid Document No:05/51/23KF(SRI RAM - VIJAIPUR)/GAIL/030A |
1500 (IST) on 10th June, 2008 |
| -- |
-- |
Addendum No. 3 |
Bid Document No:05/51/23KF(SRI RAM - VIJAIPUR)/GAIL/030A |
1500 (IST) on 19th June, 2008 |
| 126. |
19th May, 2008 |
For Metering Skids For Bhushan Steels, Ghaziabad |
Bid Document No:05/51/23KF(BHUSAN)/GAIL/030 |
1500 (IST) on 11th June, 2008 |
| -- |
-- |
Addendum No. 1 |
Bid Document No:05/51/23KF(BHUSAN)/GAIL/030 |
1500 (IST) on 11th June, 2008 |
| -- |
-- |
Addendum No. 2 |
Bid Document No:05/51/23KF(BHUSAN)/GAIL/030 |
1500 (IST) on 11th June, 2008 |
| 125. |
19th May, 2008 |
Supply Of Granular Activated Carbon. |
GAIL/PA08/18193/3200043706/SD |
1500 (IST) on 10th June, 2008 |
| 124. |
19th May, 2008 |
Supply of DI-ETHYL Aluminium Ethoxide (DEAE), Quantity: 12 MT
|
GAIL/PA08/17701/3200043704/SD |
1200 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PA08/17701/3200043704/SD |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/PA08/17701/3200043704/SD |
1500 (IST) on 01st July, 2008 |
| 123. |
19th May, 2008 |
For Appointment of Lead Arrnager For Financial Closure for Loans
|
Tender No.BCPL/ND/(C&P)08/0001 |
1400 (IST) on 02nd June, 2008 |
| -- |
-- |
Corrigendum No. - 1 |
Tender No.BCPL/ND/(C&P)08/0001 |
1400 (IST) on 09th June, 2008 |
| 122. |
17th May, 2008 |
For Out Sourcing Of Services For Mumbai Zonal Office
|
GAIL/MZL/C&P/SR 20018184 |
1400 (IST) on 07th June, 2008 |
| 121. |
17th May, 2008 |
Procurement of Field Instrumentation Items for LPG Despatch Terminal in Jamnagar
|
Bid Document No. 05/51/23KF(EOL)/GAIL/054 |
1500 (IST) on 31th May, 2008 |
| 120. |
17th May, 2008 |
For Operational Assistance Services
For Field Operations In LPG/NTGG Unit Areas & Off Sites At GPU-VAGHODIA
|
GAIL/VAG/18130/3300024753/C&P/W2008002 |
1400 (IST) on 11th June, 2008 |
| 119. |
17th May, 2008 |
Procurement of Pre Filters for AHU.
|
GAIL/HZR/FL-P15/3200043687/AMT |
1400 (IST) on 11th June, 2008 |
| 118. |
17th May, 2008 |
Laying and Construction of Steel Pipeline EPC for TATA Power, HPCL & Asahi Glass in Mumbai
|
BID DOCUMENT NO. 11/0226B/JPK/GAIL/01-R0 |
1430 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
BID DOCUMENT NO. 11/0226B/JPK/GAIL/01-R0 |
1430 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No.2 |
BID DOCUMENT NO. 11/0226B/JPK/GAIL/01-R0 |
1430 (IST) on 16th June, 2008 |
| -- |
-- |
Corrigendum No.3 |
BID DOCUMENT NO. 11/0226B/JPK/GAIL/01-R0 |
1430 (IST) on 16th June, 2008 |
| 117. |
17th May, 2008 |
Procurement Of Motor ABB Make |
GAIL/VIZ/017569/3200043682/SG/ |
1400 (IST) on 06th June, 2008 |
| 116. |
17th May, 2008 |
Flood light poles with flame proof Bulkhead fittings for Consumer
terminals. |
GAIL/PY/08/3391/3300024765/2K7003 |
1400 (IST) on 09th June, 2008 |
| 115. |
17th May, 2008 |
For Garbage Bin |
GAIL/VH/08/M037/3200043681/HR |
1400 (IST) on 04th June, 2008 |
| 114. |
17th May, 2008 |
Hiring Of Pest Control Services For GAILTEL/Telecom Installations
Under Agra Region |
GAIL/AG/08/0203/3300024742/JBS/C&P |
1400 (IST) on 17th June, 2008 |
| 113. |
17th May, 2008 |
Procurement Of Flexible Hoses For GAIL, PATA |
GAIL/PA08/17692/3200043676/KN |
1400 (IST) on 10th June, 2008 |
| 112. |
16th May, 2008 |
ARC for supply of computer consumables for GAIL Mumbai |
GAIL/MU/CP/BALA/3200043650 |
1400 (IST) on 03rd June, 2008 |
| 111. |
16th May, 2008 |
For Procurement of Flexible Hoses |
GAIL/VL/08/M046/3200043670/MECH-LPG |
1400 (IST) on 10th June, 2008 |
| 110. |
16th May, 2008 |
For Arrangement Of Packaged Drinking Water |
GAIL/VSVJ/18380/3300024724/2008/SR02 |
1400 (IST) on 20th June, 2008 |
| 109. |
16th May, 2008 |
For Battery Charger |
GAIL/VSVJ/18093/3200043646/2008/PR03 |
1400 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VSVJ/18093/3200043646/2008/PR03 |
1400 (IST) on 20th June, 2008 |
| 108. |
16th May, 2008 |
Procurement of Spare Vacuum Switch For SAC Applicators In Bagging At GAIL, PATA |
GAIL/PA08/18297/320043647/SS |
1500 (IST) on 06th June, 2008 |
| 107. |
16th May, 2008 |
Procurement Of Gaskets For GAIL, PATA |
GAIL/PA08/17900/3200043634/KN |
1400 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/17900/3200043634/KN |
1400 (IST) on 04th July, 2008 |
| 106 |
15th May, 2008 |
PTC (Pre-Tendering Conference) Tender for Annual Rate Contract for
civil Maintenance for GAIL NCR Region |
GAIL/NOIDA/C&P/8007/PTC |
1100 (IST) on 30th May, 2008 |
| 105. |
15th May, 2008 |
For Hiring Of Services For Lining Up Rate Contract For Operation And Maintenance Of Workshop Machinne At GAIL, PATA |
GAIL/PATA/C&P/20017557/SK |
1500 (IST) on 10th June, 2008 |
| 104. |
15th May, 2008 |
For High Speed Diesel |
GAIL/SA/07/PR31/3200043597/RC/2008-09 |
1400 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/SA/07/PR31/3200043597/RC/2008-09 |
1400 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/SA/07/PR31/3200043597/RC/2008-09 |
1400 (IST) on 11th July, 2008 |
| 103. |
15th May, 2008 |
For Water Meter |
GAIL/SA/08/PR01/3200043620/RC/2008-09 |
1400 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/SA/08/PR01/3200043620/RC/2008-09 |
1400 (IST) on 20th June, 2008 |
| 102. |
15th May, 2008 |
Spares For Fire Water Engine |
GAIL/SA/07/PR32/3200043623/RC/2008-09 |
1400 (IST) on 06th June, 2008 |
| 101. |
15th May, 2008 |
For Hiring Services of 01 no TATA INDICA (AC) for 02 years for Mumbai office |
GAIL/MUMBAI/C&P/SR20018354 |
1500 (IST) on 29th May, 2008 |
| 100. |
15th May, 2008 |
Hiring of PMC Services for Upgradation of Kandla-Samakhiali LPG Pipeline |
BIDDING DOCUMENT NO: 8000000399 |
1400 (IST) on 18th June, 2008 |
| -- |
-- |
Clarifications To The Queries Raised By Bidders |
BIDDING DOCUMENT NO: 8000000399 |
1400 (IST) on 18th June, 2008 |
| -- |
-- |
Amendmnet No. 1 |
BIDDING DOCUMENT NO: 8000000399 |
1400 (IST) on 18th June, 2008 |
| 99. |
15th May, 2008 |
For Battery. |
GAIL/VL/08/M014/3200043614/ELECT |
1400 (IST) on 03rd June, 2008 |
| 98. |
15th May, 2008 |
Approval Of Plot Plan Of LPG Recovery Plant,
Lakwa By Chief Inspector Of Factories, Assam
And CCOE, KOLKATA |
GAIL/LA/C&P/189/3300024710/TS/ASB |
1400 (IST) on 03rd June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/LA/C&P/189/3300024710/TS/ASB |
1400 (IST) on 10th June, 2008 |
| 97. |
15th May, 2008 |
Procurement Of Refrigeration Compressor For AC Package For GAIL, PATA |
GAIL/PA08/07386/3200043621/KN |
1500 (IST) on 06th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/07386/3200043621/KN |
1500 (IST) on 08th July, 2008 |
| 96. |
15th May, 2008 |
Printing of Stationery items at GAIL, cauvery basin. |
GAIL/PY/08/8597/3200043606/2008004 |
1400 (IST) on 09th June, 2008 |
| 95. |
14th May, 2008 |
Printing of stationary |
GAIL/HZR/FL-P11/3200043539/AMT |
1400 (IST) on 11th June, 2008 |
| 94. |
14th May, 2008 |
For "recertification of OHSAS (18001:2007)" |
GAIL/LA/C&P/185/3300024671/TS/ASB |
1400 (IST) on 03rd June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/LA/C&P/185/3300024671/TS/ASB |
1400 (IST) on 10th June, 2008 |
| 93. |
14th May, 2008 |
For Procurement Of PLC Based CO2 Flooding System Gas Turbine In GPU At GAIL, PATA INDIA |
GAIL/PA08/18435/3200043538/SS |
1500 (IST) on 06th june, 2008 |
| -- |
-- |
Corriengdum No. 1 |
GAIL/PA08/18435/3200043538/SS |
1500 (IST) on 08th July, 2008 |
| 92. |
14th May, 2008 |
Procurement of Pens |
GAIL/US/08/P011/3200043555/FL-021/08-09 |
1400 (IST) on 30th May, 2008 |
| 91. |
14th May, 2008 |
For Photo Copy Paper |
GAIL/VH/08/M034/3200043588/STORES |
1400 (IST) on 04th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VH/08/M034/3200043588/STORES |
1400 (IST) on 04th June, 2008 |
| 90. |
14th May, 2008 |
For Procurement Of Gate Valve |
GAIL/VAGH/18572/3200043556/C&P/ELECT |
1400 (IST) on 04th June, 2008 |
| 89. |
14th May, 2008 |
Insulating Joints for VDPL Project |
BIDDING DOCUMENT NO.: SST/6921-060-QG-MR-9050/1005 |
1200 (IST) on 12th June, 2008 |
| 88. |
14th May, 2008 |
Service Contract For Hiring Of Vehicles On Call Basis(All Ac) For GAIL PATA |
GAIL/PATA/C&P/PSER/20017005/SR |
1500 (IST) on 06th June, 2008 |
| 87. |
13th May, 2008 |
ROU Protection & Washout Repair Works At Ch.
5.5km And Ch. 180.95km |
GAIL/VIZ/018509/3300024667/SG/ |
1400 (IST) on 06th June, 2008 |
| 86. |
13th May, 2008 |
For
Supply Of Intake Air Filter Elements At GAIL, VAGHODIA- INDIA |
GAIL/VAG/C&P/18237/FILTERS/CWH/MECH/2008 |
1400 (IST) on 17th June, 2008 |
| 85. |
13th May, 2008 |
For Procurement Of Pedestal Fan |
GAIL/BLR/08/P02/3200043536/C&P/NM/DPPL |
1400 (IST) on 21st May, 2008 |
| 84. |
13th May, 2008 |
For Maintenance Of Lawn At Around Polymer Bhawan, Technical
Building,Lab Building & Development Of Lawn At GAIL PATA (AURAIYA) |
GAIL/PATA/C&P/20016449/SKG/08 |
1500 (IST) on 03rd June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/20016449/SKG/08 |
1500 (IST) on 03rd June, 2008 |
| 83. |
13th May, 2008 |
AMC for System PC of PLC and Online GC in KKD region. |
GAIL/08/RJ18507/3300024668/ |
1400 (IST) on 04th June, 2008 |
| 82. |
13th May, 2008 |
For Procurement Of Hard Disk For CCTV System At GAIL PATA |
GAIL/PA08/18182/3200043531/SS |
1500 (IST) on 03rd June, 2008 |
| 81. |
13th May, 2008 |
For Repair/ Refurbishment Of Frame 1 Gt Pulled Out Components Of LPG Plant, Vijaipur |
GAIL/VL/08/C024/3300024663/MECH |
1400 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VL/08/C024/3300024663/MECH |
1400 (IST) on 01st July, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/VL/08/C024/3300024663/MECH |
1400 (IST) on 23rd July, 2008 |
| 80. |
13th May, 2008 |
For Hiring of [LMV Tavera/Toyota Innova]for LPG Pipeline to IOCL Dongar Project |
GAIL/VH/08/C038/3300024651/CONST |
1400 (IST) on 04th June, 2008 |
| 79. |
13th May, 2008 |
For Transportation of apprx. 1200 MT/1783 KL of N-Hexane from M/s HPCL/BPCL Mumbai to GAIL PATA (U.P.) in Road Tankers |
GAIL/PA08/18530/3300024650/SD |
1500 (IST) on 27th May, 2008 |
| 78. |
12th May, 2008 |
Flow Tees for VDPL Project |
BIDDING DOCUMENT NO.: SST/6921-060-QL-MR-9040/1006 |
1200 (IST) on 10th June, 2008 |
| 77. |
12th May, 2008 |
Appointment Of Consultant For Carr(Cost
Accounting Record Rules) For JLPL |
GAIL/FL-026/CNS/3300024649/JP/C&P/08-09 |
1400 (IST) on 30th May, 2008 |
| 76. |
12th May, 2008 |
Painting Of Structures, Slogan Boards, Road
Marking Etc. At Despatch Terminal, Vizag |
GAIL/VIZ/018394/3300024648/SG/ |
1400 (IST) on 06th June, 2008 |
| 75. |
12th May, 2008 |
Supply of Printers |
GAIL/PA08/17560/3200043528/NM |
1500 (IST) on 30th May, 2008 |
| 74. |
12th May, 2008 |
Supply Of Safety Valves |
GAIL/PATA/C&P/PR 20018279/NM |
1500 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PATA/C&P/PR 20018279/NM |
1500 (IST) on 20th June, 2008 |
| 73. |
12th May, 2008 |
For Construction of Security Posts at Khanpur tanker parking area and at HDPE barrier in Plant " at GAIL, Pata. |
GAIL/PATA/C&P/20013511/LK/08 |
1500 (IST) on 03rd June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PATA/C&P/20013511/LK/08 |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No.2 |
GAIL/PATA/C&P/20013511/LK/08 |
1500 (IST) on 11th July, 2008 |
| -- |
-- |
Corrigendum No.3 |
GAIL/PATA/C&P/20013511/LK/08 |
1500 (IST) on 1st August, 2008 |
| 72. |
9th May, 2008 |
For conversion of room Pantry. |
GAIL/VIZ/018319/3300024645/SG/ |
1400 (IST) on 06th June, 2008 |
| 71. |
9th May, 2008 |
For Supply Of Heat-exchanger (11-e-104) For LPG Column Condensor At LPG Plant, GAIL VIJAIPUR |
GAIL/VL/08/M026/3200043523/MECH |
1400 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VL/08/M026/3200043523/MECH |
1400 (IST) on 24th June, 2008 |
| 70. |
9th May, 2008 |
For "Procurement of computers & peripherals for plant instrument control system at GPU, GAIL, Gandhar". |
GAIL/GA/2K8004/3200043506/C&P/I/YS/ |
1400 (IST) on 29th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/GA/2K8004/3200043506/C&P/I/YS/ |
1400 (IST) on 19th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/GA/2K8004/3200043506/C&P/I/YS/ |
1500 (IST) on 08th July, 2008 |
| 69. |
9th May, 2008 |
For Arrangement Of Dinner On The Occasion Of
Achievement Of Polymer Porduction MOU
Excellent Target For FY 2007-08 : 378,358MT On 17 |
GAIL/PSER/18429/3300024646/AW |
1400 (IST) on 13th May, 2008 |
| 68. |
9th May, 2008 |
For Third Party Inspection For Preparation Of Joint Scope Of Work And Witnessing Performance Testing Of Full Life Overhauled Gas Generators. |
GAIL/VH/08/I022/3300024647/HAZ-MECH |
1400 (IST) on 11th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VH/08/I022/3300024647/HAZ-MECH |
1400 (IST) on 25th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/VH/08/I022/3300024647/HAZ-MECH |
1400 (IST) on 02nd July, 2008 |
| 67. |
9th May, 2008 |
Procurement of Exhaust Fans and Pedestal Fans |
GAIL/US/08/P010/3200043514/FL-130/07-08 |
1400 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/US/08/P010/3200043514/FL-130/07-08 |
1400 (IST) on 12th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/US/08/P010/3200043514/FL-130/07-08 |
1400 (IST) on 04th July, 2008 |
| 66. |
9th May, 2008 |
For Upkeep Services At Bachelor Hostels & Hospital
At GAIL (India) Limited,Vijaipur |
GAIL/VH/08/C039/3300024611/HRM |
1400 (IST) on 27th May, 2008 |
| 65. |
9th May, 2008 |
ARC for maintenance of Horticulture at Faridabad terminal |
GAIL/FBD/GAS-O&M/M-18/HORT/2008 |
1400 (IST) on 27th May, 2008 |
| 64. |
9th May, 2008 |
Procurement Of Battery On Buy Back Basis |
GAIL/AG/08/0002/3200043515/JBS/C&P/ |
1400 (IST) on 23rd May, 2008 |
| 63. |
8th May, 2008 |
For Calibartion And Testing Of Master Instruments Of GAIL, JAMNAGAR |
GAIL/JA/08/RS04/3300024637/RC/2008-09 |
1400 (IST) on 30th May, 2008 |
| 63. |
8th May, 2008 |
For
Scraper Trap, Pig Signallers
& Quick Opening End Closure |
BIDDING DOCUMENT NO.: SST/6921-060-QF-MR-9030/1004 |
1200 (IST) on 09th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
BIDDING DOCUMENT NO.: SST/6921-060-QF-MR-9030/1004 |
1200 (IST) on 09th June, 2008 |
| 62. |
8th May, 2008 |
Hiring Of 01 No.Of Maruti Esteem A/C Or
Equivalent And 01 No.Of Non A/C Ambassador Car |
GAIL/CZ/08/8468/3300024610/ |
1400 (IST) on 28th May, 2008 |
| -- |
-- |
Clarification |
GAIL/CZ/08/8468/3300024610/ |
1400 (IST) on 28th May, 2008 |
| 61. |
8th May, 2008 |
Procurement Of Coriolis Mass Flow Meters For Stock Accounting Of NTGG Plant |
GAIL/VAGH/17890/3200043468/C&P/INSTT. |
1400 (IST) on 11th June, 2008 |
| 60. |
8th May, 2008 |
General Civil Repair & Maintenance works at GAIL Vihar & Compressor Station, Dibiyapur, Dist. Auraiya (U.P.) |
GAIL/PATA/C&P/20017331/SK/08 |
1500 (IST) on 30th May, 2008 |
| 59. |
8th May, 2008 |
Procurement Of Cartridge For Xerox Machine |
GAIL/BDA/08/009/3200043478/ID/01 |
1400 (IST) on 30th May, 2008 |
| 58. |
8th May, 2008 |
For Fluorescent Apron. |
GAIL/VL/08/M015/3200043466/F&S |
1400 (IST) on 27th May, 2008 |
| 57. |
7th May, 2008 |
For 'Boiler Inspection and Maintenance at LPG, Usar' |
GAIL/US/08/W006/3300024600/FL-23 /08-09 |
1400 (IST) on 30th May, 2008 |
| 56. |
7th May, 2008 |
Supply of Spares For Battery Charger At GAIL, KANDLA |
GAIL/FL-012/PUR/3200043455/JP/C&P/08-09 |
1400 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/FL-012/PUR/3200043455/JP/C&P/08-09 |
1400 (IST) on 20th June, 2008 |
| 55. |
7th May, 2008 |
Gas Chromatograph |
GAIL/BDA/08/012/3200043454/ID/02 |
1400 (IST) on 23rd May, 2008 |
| 54. |
7th May, 2008 |
For Procuremnet Of Speed Probes For Rotary Equiptments At GAIL, PATA |
GAIL/PA07/17665/3200042302/SS |
1500 (IST) on 20th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA07/17665/3200042302/SS |
1500 (IST) on 20th June, 2008 |
| 53. |
6th May, 2008 |
Procurement Of Photocopier Paper & Box Files |
GAIL/JA/08/RM03/3200043432/RC/2008-09 |
1400 (IST) on 27th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/JA/08/RM03/3200043432/RC/2008-09 |
1400 (IST) on 03rd June, 2008 |
| 52. |
6th May, 2008 |
For Maintenance Of Lead Acid Battery Banks At GAIL
(INDIA) LIMITED, KANDLA. |
GAIL/KA/07/SR18/3300024543/RC/07-08 |
1400 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/KA/07/SR18/3300024543/RC/07-08 |
1400 (IST) on 13th June, 2008 |
| 51. |
6th May, 2008 |
For Stack monitoring of DEG & FWPs , ambien air and sewage affluent & potable water testing . |
GAIL/KA/07/SR17/3300024555/RC/07-08 |
1400 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/KA/07/SR17/3300024555/RC/07-08 |
1400 (IST) on 17th June, 2008 |
| 50. |
6th May, 2008 |
For 'Hiring of consultancy services for renovation/modification of reception area, conference room (G/F) including civil, electrical, air-conditioning & related works in administrative building at GAIL (India) Limited, Vijaipur". |
GAIL/VH/08/C020/3300024542/CIVIL |
1400 (IST) on 28th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VH/08/C020/3300024542/CIVIL |
1400 (IST) on 18th June, 2008 |
| 49. |
6th May, 2008 |
Fabrication Of The MS Ring For RG Comp Coupling
And Lef Reboiler |
GAIL/VAG/18463//3300024539/C&P/M/W8006L |
1400 (IST) on 28th May, 2008 |
| 48. |
6th May, 2008 |
For PC Peripherals |
GAIL/ND/08002/3200043367/2008002 |
1400 (IST) on 16th May, 2008 |
| 47. |
6th May, 2008 |
For Rectifier. |
GAIL/VH/08/M042/3200043374/P/L |
1400 (IST) on 28th May, 2008 |
| 46. |
6th May, 2008 |
For Corrosion Coupons. |
GAIL/VL/08/M044/3200043424/OPS |
1400 (IST) on 27th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VL/08/M044/3200043424/OPS |
1400 (IST) on 10th June, 2008 |
| 45. |
6th May, 2008 |
For Medical Equipments. |
GAIL/VH/08/M041/3200043365/medical |
1400 (IST) on 28th May, 2008 |
| 44. |
6th May, 2008 |
For Tools |
GAIL/VL/08/M043/3200043416/F&S |
1400 (IST) on 27th May, 2008 |
| 43. |
6th May, 2008 |
For Valve-key |
GAIL/VL/08/M041/3200043398/F&S |
1400 (IST) on 27th May, 2008 |
| 42. |
6th May, 2008 |
Vibration monitoring of Rotating Equipments Installed in all units of VSPL |
GAIL/VIZ/018330/3300024544/SG/ |
1400 (IST) on 27th May, 2008 |
| 41. |
6th May, 2008 |
For AMC For OFC Maintenance Of GAILNET Under GAIL, ABUROAD JURISDICTION |
GAIL/ABR/08/763/3300024556/20018447/C&P |
1400 (IST) on 19th May, 2008 |
| 40. |
5th May, 2008 |
For "Maintenance of telephone & CATV Network at GAIL (India) Limited, Vijaipur". |
GAIL/VH/08/C034/3300024523/GAILTEL |
1400 (IST) on 21st May, 2008 |
| 39. |
5th May, 2008 |
For "Maintenance of telephone lines at GAIL (India) Limited, Vijaipur". |
GAIL/VL/08/C035/3300024531/GAILTEL |
1400 (IST) on 21st May, 2008 |
| 38. |
5th May, 2008 |
For 02 year Horticulture work at IPS Mansarampura, Jaipur |
GAIL/FL-023/SER/3300024508/JP/C&P/08-09 |
1400 (IST) on 30th May, 2008 |
| 37. |
5th May, 2008 |
Procurement UPS For HDPE#1& LLDPE Bagging Unit At GAIL PATA |
GAIL/PA08/18015/3200043312/SS |
1500 (IST) on 10th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PA08/18015/3200043312/SS |
1500 (IST) on 24th June, 2008 |
| 36. |
5th May, 2008 |
Prcurement Potassium Bicarbonate Dry Chemical Powder. |
GAIL/VAGH/18491/3200043315/C&P/F&S |
1400 (IST) on 28th May, 2008 |
| 35. |
5th May, 2008 |
For Procurement of MCCB & Retrofitting job |
GAIL/PR20017863/3400000247/JHA/08/08 |
1400 (IST) on 30th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PR20017863/3400000247/JHA/08/08 |
1400 (IST) on 17th June, 2008 |
| 34. |
5th May, 2008 |
For Tools & Consumable. |
GAIL/PR20018032/3200043343/JHA/09/08 |
1400 (IST) on 30th May, 2008 |
| 33. |
5th May, 2008 |
Procurement Of Dual Cordless Phone At GAIL PATA |
GAIL/PA08/14621/3200043328/SS |
1500 (IST) on 30th May, 2008 |
| 32. |
5th May, 2008 |
For P and ID of Hazuira Compressor Station. |
GAIL/HZR/FL-C10/3300024495/AMT |
1400 (IST) on 04th June, 2008 |
| -- |
-- |
Corringedum No. 1 |
GAIL/HZR/FL-C10/3300024495/AMT |
1400 (IST) on 25th June, 2008 |
| 31. |
5th May, 2008 |
Supply & Installation of Swing at GAIL Colny at Surat. |
GAIL/HZR/FL-P14/3200043295/AMT |
1400 (IST) on 04th June, 2008 |
| 30. |
5th May, 2008 |
Horticultural Maintenance & Plantation Work At MALANPUR Terminal Under GAIL (INDIA) LIMITED-GWALIOR |
GAIL/VH/08/C014/3300024482/PL-GWL |
1400 (IST) on 21st May, 2008 |
| 29. |
5th May, 2008 |
For Material Handling Services At GAIL (INDIA) LIMITED, VIJAIPUR |
GAIL/VH/08/C042/3300024507/STORES |
1400 (IST) on 21st May, 2008 |
| 28. |
5th May, 2008 |
For "Supply, Installation & Commissioning of Variable Frequency Drive at GPU, GAIL (India) Ltd., Gandhar" |
GAIL/GA/2K7085 /3400000245/C&P/E/JC/ |
1400 (IST) on 05th June, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/GA/2K7085 /3400000245/C&P/E/JC/ |
1400 (IST) on 17th June, 2008 |
| 27. |
5th May, 2008 |
For Kitchen Equipment |
GAIL/ND/07/112R/3200043311/C&P/20016790 |
1400 (IST) on 20th May, 2008 |
| 26. |
3rd May, 2008 |
For "Rate Contract For Supply Of Lighting Material For A Period Of One Year For GAIL, VIJAIPUR" |
GAIL/VL/08/M001/3200043285/ELECT |
1400 (IST) on 03rd June, 2008 |
| 25. |
3rd May, 2008 |
For Procurement of 'Split Type Air Conditioners'. |
GAIL/US/08/P009/3200043281/FL-018/08-09 |
1400 (IST) on 23rd May, 2008 |
| 24. |
3rd May, 2008 |
Pest Control Service At DESU & RR Station |
GAIL/NOIDA/7065/3300024430/ |
1400 (IST) on 21st May, 2008 |
| 23. |
3rd May, 2008 |
For procurement of 'Suction Air Filters'. |
GAIL/US/08/P008/3200043240/FL-019/08-09 |
1400 (IST) on 23th May, 2008 |
| 22. |
3rd May, 2008 |
Procurement of Pesto Flash. |
GAIL/HZR/FL-P12/3200043263/AMT |
1400 (IST) on 04th June, 2008 |
| 21. |
3rd May, 2008 |
Procurement of Thermal Overload Relay. |
GAIL/HZR/FL-P13/3200043247/AMT |
1400 (IST) on 04th June, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/HZR/FL-P13/3200043247/AMT |
1400 (IST) on 25th June, 2008 |
| 20. |
3rd May, 2008 |
Safety Helmet |
GAIL/NA/08/006 /3200043282/FL-1089 |
1400 (IST) on 21st May, 2008 |
| 19. |
3rd May, 2008 |
Supply And Installation Of Capacitor Unit With
Its On/Off Modules At GAIL Colony Under O&M
Base, Nasirabad. |
GAIL/NA/08/005/3300024481/FL-1088 |
1400 (IST) on 21st May, 2008 |
| 18. |
3rd May, 2008 |
Annual Maintenance Contract for Winows based SCADA system
equipments at Noida |
GAIL/NOIDA/8005/3300024431/ |
1400 (IST) on 23rd May, 2008 |
| 17. |
3rd May, 2008 |
For Procurement Of Hydro-pneumatic Pump For Safety Valve Test JIG At GAIL PATA. |
GAIL/PA08/18022/3200043226/SS |
1500 (IST) on 23rd May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/18022/3200043226/SS |
1500 (IST) on 24th June, 2008 |
| 16. |
3rd May, 2008 |
For Procurement Of Feed Gas Filter. |
GAIL/VAGH/18276/3200043229/C&P/MECH |
1400 (IST) on 28th May, 2008 |
| 15. |
3rd May, 2008 |
Housekeeping & Cleaning, upkeep and maintenance of GAIL LPG
Recovery Plant, Administrative building Lakwa |
GAIL/LA/REV/181/3300024468/C&P/HR/ASB |
1400 (IST) on 16th May, 2008 |
| 14. |
2nd May, 2008 |
Cotton Pant & Shirt For Dangry |
GAIL/NOIDA/7055/3200043205/ |
1400 (IST) on 23th May, 2008 |
| 13. |
2nd May, 2008 |
Supply Of Safety Kit |
GAIL/NOIDA/7055/3200043206/ |
1400 (IST) on 23th May, 2008 |
| 12. |
2nd May, 2008 |
For Procurement Of Consumables For Ferrule Printing Machine At GAIL Pata |
GAIL/PA08/18107/3200043204/SS |
1500 (IST) on 27th May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/PA08/18107/3200043204/SS |
1500 (IST) on 24th June, 2008 |
| 11. |
2nd May, 2008 |
Hiring Of Support Services For GAIL PONDICHERRY
Office |
GAIL/PY/08/8412/3300024423/2K8005 |
1400 (IST) on 24th May, 2008 |
| -- |
-- |
Corrigendum No.1 |
GAIL/PY/08/8412/3300024423/2K8005 |
1400 (IST) on 09th June, 2008 |
| 10. |
2nd May, 2008 |
Procurement Of Coupling Bolts For R G COMP A B |
GAIL/VAG/16578L/3200039373/C&P/M/43/7RT |
1400 (IST) on 21st May, 2008 |
| 9. |
2nd May, 2008 |
Audit of New Website for GAIL Tenders |
GAIL/ND/C&P/BIS/C-2803/3300024395 |
1400 (IST) on 19th May, 2008 |
| 8. |
1st May, 2008 |
For Erection Of Knock Out Drum |
GAIL/HZR/FL-C09/3300024343/AMT |
1400 (IST) on 04th June, 2008 |
| 7. |
1st May, 2008 |
For Supply Installation & Commissioning Of 100tr Cooling Tower For HVAC Of GREP Control Room |
GAIL/VAGH/18387/3200043194/C&P/ELECT |
1400 (IST) on 28th May, 2008 |
| 6. |
1st May, 2008 |
Procurement of DEG protection System relay. |
GAIL/HZR/FL-P06/3200043162/AMT |
1400 (IST) on 28th May, 2008 |
| 5. |
1st May, 2008 |
Annual rate contract for Maintenance & Modification of SCADA
System for Ahmedabad(O&M) |
GAIL/BDA/08/008/3300024378/WS/05 |
1400 (IST) on 27th May, 2008 |
| 4. |
1st May, 2008 |
Hiring of courier services. |
GAIL/BDA/08/007/3300024365/WS/01 |
1400 (IST) on 23th May, 2008 |
| 3. |
1st May, 2008 |
Mass flow meter box. |
GAIL/NA/08/004/3300024389/FL-1087 |
1400 (IST) on 21st May, 2008 |
| 2. |
1st May, 2008 |
For High Speed Diesel |
GAIL/ABR/08/27/3200043192/018454/C&P |
1400 (IST) on 19th May, 2008 |
| 1. |
1st May, 2008 |
For Procurement of LCD Monitor |
GAIL/VAG/CPR/05//C&P/I/08 |
1400 (IST) on 21st May, 2008 |
| -- |
-- |
Corrigendum No. 1 |
GAIL/VAG/CPR/05//C&P/I/08 |
1400 (IST) on 04th June, 2008 |
| -- |
-- |
Corrigendum No. 2 |
GAIL/VAG/CPR/05//C&P/I/08 |
1400 (IST) on 25th June, 2008 |