| 259. |
31st
August, 2007 |
Procurement Of
Methanol |
GAIL/US/07/P029/3200035715/FL-064/07-08 |
1400 (IST) on 10thSeptember, 2007 |
| 258. |
31st
August, 2007 |
Supply
,
Installation
& Commissioning of
DEW POINT METER at GAIL, Gandhar |
GAIL/GA/2K7032/3200035691/C&P/LAB/Y/ |
1400 (IST) on 11thOctober, 2007 |
| 257. |
31st
August, 2007 |
Contract For
Fabrication, Erection And Commissioning Of 12/16" C.S. Pipe Line From R-3 Reservoir To Pata Pond In Raw
Water Treatment Plant At Gail, Pata |
GAIL/PATA/C&P/20013927/RK |
1400 (IST) on 18thSeptember, 2007 |
| 256. |
31st
August, 2007 |
Supply Of Air
Conditioners |
GAIL/ND/07/4044/3200035705/C&P/20014428 |
1400 (IST) on 19thSeptember, 2007 |
| 255. |
30th
August, 2007 |
Safety Audit &
Safety Report For Lpg Plant, Usar
|
GAIL/US/07/W007/3300019724/FL-58/07-08 |
1400 (IST) on 21stSeptember, 2007 |
| 254. |
30th
August, 2007 |
Annual Rate
Contract for Project Management Consultancy (PAC) Services for Spur/Small Pipeline Projects
|
GAIL/ND/C&P/PROJ/PMC/ARC/07-19/02 |
1400 (IST) on 28thSeptember, 2007 |
| -- |
-- |
Clarification :Regarding Tender Document
|
GAIL/ND/C&P/PROJ/PMC/ARC/07-19/02 |
1400 (IST) on 28thSeptember, 2007 |
| 253. |
30th
August, 2007 |
Construction Of
Security Posts At Lpg Tanker Parking Area & Hdpe Barrier At Gail, Pata |
GAIL/PATA/C&P/20013511/LK |
1400 (IST) on 21stSeptember, 2007 |
| 252. |
30th
August, 2007 |
Annual Maintenance
Contract For Fire & Safety-gail Vspl |
GAIL/VIZ/014386/3300019727/SG |
1400 (IST) on 21stSeptember, 2007 |
| 251. |
30th
August, 2007 |
Procurement of Air
Handling Unit |
GAIL/HZR/FL-36P/3200035648/AMT |
1400 (IST) on 3thOctober, 2007 |
| 250. |
30th
August, 2007 |
Renovation
works at 2nd, 3rd & 4th Floor including toilets and drinking water line at PARC, Noida |
GAIL/ND/07/0037/3300019726/20014808 |
1400 (IST) on 6thSeptember, 2007 |
| 249. |
29th
August, 2007 |
Isolation Valve |
GAIL/LAK/SD/33/3200035674/C&P/FS/07-08 |
1400 (IST) on 25thSeptember, 2007 |
| 248. |
29th
August, 2007 |
Procurment Of valve Sealant Sticks For Mumbai O&M |
GAIL/LAK/SD/33/3200035673/C&P/FS/07-08 |
1400 (IST) on 25thSeptember, 2007 |
| 247. |
29th
August, 2007 |
Vibration Monitoring,Analysis, Trending & Data acquisition Jobs at LPG Plant Vijaipur, Vaghodia, HVJ Compressor
stations at Hazira, Vaghodia, Jhabua, Khera, Vijaipur & Auriaya for Two years |
GAIL/VL/07/C069/3300019718/MECH |
1400 (IST) on 25thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/VL/07/C069/3300019718/MECH |
1400 (IST) on 25thSeptember, 2007 |
| 246. |
29th
August, 2007 |
Non Destructive Testing, Inspection and certification of Process Pipelines, Pressure Vessel, Lifting Machines, Tools and Tackles etc, as per Factory Act of LPG & HVJ Plants, GAIL(India)Ltd |
GAIL/VL/07/C067/3300019694/MECH |
1400 (IST) on 26thSeptember, 2007 |
| 245. |
29th
August, 2007 |
Supply Of Dc
Line Flow Control Valve |
GAIL/PA07/13842/3200035609/ANS |
1500 (IST) on 28thSeptember, 2007 |
| 244. |
29th
August, 2007 |
Rate Contract For Transportation Of Materials From GAIL (India) Limited, Vijaipur To Various Gail-sites/Locations In India |
GAIL/VH/07/C066/3300019701/HVJ-STORES |
1400 (IST) on 26thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/VH/07/C066/3300019701/HVJ-STORES |
1400 (IST) on 3rdOctober, 2007 |
| 243. |
29th
August, 2007 |
Supply Of 3
Com Switch & Rams |
GAIL/PA07/11485/3200028979/NM/RE-TENDER |
1500 (IST) on 18thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PA07/11485/3200028979/NM/RE-TENDER |
1500 (IST) on 12thOctober, 2007 |
| 242. |
29th
August, 2007 |
Renovation works
at 2nd, 3rd & 4th Floor including toilets and pump for water line at PARC, Noida |
GAIL/ND/07/0038/3300019723/20014788 |
1400 (IST) on 6thSeptember, 2007 |
| 241. |
29th
August, 2007 |
Procurement Of
Fire Hoses |
GAIL/VAG/14768/3200035599/C&P/F&S/5/7L |
1400 (IST) on 19thSeptember, 2007 |
| 240. |
29th
August, 2007 |
Procurement &
Installation Of Composite Wear Rings For Cooling Water Circulation Pumps |
GAIL/VL/07/M095/3200035594/MECH-LPG |
1400 (IST) on 19thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/VL/07/M095/3200035594/MECH-LPG |
1400 (IST) on 3rdOctober, 2007 |
| 239. |
29th
August, 2007 |
Procurement of
fiter Media for Water Treatment Plant |
GAIL/HZR/FL-37P/3200035584/AMT |
1400 (IST) on 26thSeptember, 2007 |
| 238. |
29th
August, 2007 |
Procurement of
Temprature Detector & Temprature Controller |
GAIL/HZR/FL-35P/3200035575/AMT |
1400 (IST) on 26thSeptember, 2007 |
| 237. |
29th
August, 2007 |
Renewal Of The Insurance Of Chemicals & Catalyst, Stores & Spares, Intermediate Products, By Products &
Other Finished Hydrocarbon Products |
GAIL/PATA/F&A/Ins/2007 |
1400 (IST) on 18thSeptember, 2007 |
| 236. |
29th
August, 2007 |
Procurement
Of 'sf6 Gas Circuit Breaker & Parts |
GAIL/US/07/P028/3200035597/FL-059/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 235. |
29th
August, 2007 |
Bed Sheet,
Single W/Pillow Cover |
GAIL/PR20014595/3200035624/JHA/014/07 |
1400 (IST) on 18thSeptember, 2007 |
| 234. |
29th
August, 2007 |
Supply Of High Volume Long Range Water Monitor |
GAIL/PATA/C&P/ PR 20014262/AW |
1500 (IST) on 21stSeptember, 2007 |
| 233. |
27th
August, 2007 |
Supply of Bare/Coated Linepipe for LPG P/L Project
under Inventory Creation at Vaghodia
Vol. I of II
Vol. II of II
NIT
BEC
05/51/23KF/GAIL/012 |
1500 (IST) on 27thSeptember, 2007 |
|
| -- |
-- |
Addendum - I : Regarding Tender Document |
05/51/23KF/GAIL/012 |
1500 (IST) on 27thSeptember, 2007 |
| 232. |
27th
August, 2007 |
Civil Work Around
Flare Area At Gail, Pata |
GAIL/PATA/C&P/20013416/LK |
1500 (IST) on 18thSeptember, 2007 |
| 231. |
27th
August, 2007 |
Annual Rate Contract Of Operation & Maintenance Of Battery Forklifts, Battery Charges And Spares Batteries At GAIL Pata |
GAIL/PATA/C&P/PSER/20013597/SR (PTD) |
1500 (IST) on 21stSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/PSER/20013597/SR (PTD) |
1500 (IST) on 28thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/PSER/20013597/SR (PTD) |
1500 (IST) on 5thOctober, 2007 |
| 230. |
27th
August, 2007 |
Supply Of Caustic Soda Lye |
GAIL/PA07/14466/3200035556/SD |
1500 (IST) on 21stSeptember, 2007 |
| 229. |
27th
August, 2007 |
Procurement Of A4
Size Photo Copy Paper |
GAIL/AG/07/0531/3200035566/JBS/C&P/ |
1400 (IST) on 11thSeptember, 2007 |
| 228. |
27th
August, 2007 |
Upkeeping & maintenance services for GAIL Despatch Terminak at DT, Visakhapatnam |
GAIL/VIZ/014413/3300019667/SG/ |
1400 (IST) on 18thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/VIZ/014413/3300019667/SG/ |
1400 (IST) on 25thSeptember, 2007 |
| 227. |
27th
August, 2007 |
Open Marine Transit Insurance |
GAIL/SR20014873/3300019677/JHA/C-10/07 |
1400 (IST) on 7stSeptember, 2007 |
| 226. |
27th
August, 2007 |
Insurance Coverage
For Stores Material |
GAIL/US/07/W006/FL_57/07-08 |
1400 (IST) on 14stSeptember, 2007 |
| 225. |
27th
August, 2007 |
Hiring of 01 no.
of Non-AC 10 Seater bus for 12 hrs. duty for Khera Compressor station |
GAIL/KCS/08/C10/3300019666/HR |
1400 (IST) on 21stSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/KCS/08/C10/3300019666/HR |
1400 (IST) on 16stOctober, 2007 |
| 224. |
27th
August, 2007 |
Procurement Activated Alumina |
GAIL/VL/07/M109/3200035524/OPS |
1400 (IST) on 18thSeptember, 2007 |
| 223. |
27th
August, 2007 |
Procurement Molecular Sieves |
GAIL/VL/07/M108/3200035549/OPS |
1400 (IST) on 18thSeptember, 2007 |
| 222. |
27th
August, 2007 |
Procurement Of Batteries |
GAIL/KCS/08/016/3200035540/PIPELINE |
1400 (IST) on 18thSeptember, 2007 |
| -- |
-- |
Extension of Due date of opening of tender. |
GAIL/KCS/08/016/3200035540/PIPELINE |
1400 (IST) on 12thOctober, 2007 |
| 221. |
27th
August, 2007 |
House-keeping
Services at Khera Compressor Station and Nana Khera Ujjain |
GAIL/KCS/08/C11/3300019654/HR Services |
1400 (IST) on 21stSeptember, 2007 |
| 220. |
25th
August, 2007 |
Interconnection Of
Hlpl And Ntpc Pipeline |
GAIL/HZR/FL-37C/3300019586/AMT |
1400 (IST) on 26thSeptember, 2007 |
| 219. |
25th
August, 2007 |
ARC for Plant
Electrical maintenance at GAIL Compressor Station, Hazira |
GAIL/HZR/FL-37C/3300019586/AMT |
1400 (IST) on 26thSeptember, 2007 |
| 218. |
25th
August, 2007 |
Procurement Of Compressor, Reciprocating |
GAIL/VAGH/12110/3200035499/C&P/LPG/ELE |
1400 (IST) on 19thSeptember, 2007 |
| 217. |
25th
August, 2007 |
Procurement Of Portable Generator Set At GAIL, Baroda |
GAIL/BDA/07/030/3200035490/ID/03 |
1400 (IST) on 18thSeptember, 2007 |
| 216. |
25th
August, 2007 |
Mech. Seals |
GAIL/VAGH/11326/
3200035534
/C&P/LPG/MECH |
1400 (IST) on 19thSeptember, 2007 |
| 215. |
25th
August, 2007 |
Calibration of Instrumentation Lab Masters |
GAIL/LA/C&P/159/3300019606/INST/ASB |
1400 (IST) on 11thSeptember, 2007 |
| 214. |
25th
August, 2007 |
Fire Proofing
works at IPS, Nasirabad, Jaipur & Abu Road |
GAIL/NA/07/038/3300019641/FL-1043 |
1400 (IST) on 21stSeptember, 2007 |
| 213. |
25th
August, 2007 |
Procurement Of Potassium Bicarbonate Dry Chemical Powder |
GAIL/VAGH/13585/3200035500/C&P/F&S |
1400 (IST) on 26thSeptember, 2007 |
| 212. |
25th
August, 2007 |
Construction of Security cabins in Cauvery basin Terminals, Additional shed at GAIL Narimanam terminal and additional Room for office
space at GAIL PPCL terminal |
GAIL/PY/07/3821/3300019629/2K7009 |
1400 (IST) on 17thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/PY/07/3821/3300019629/2K7009 |
1400 (IST) on 27thSeptember, 2007 |
| 211. |
24th
August, 2007 |
4 Mbps (2xe1) Internet Bandwidth |
GAIL/ND/C&P/IBIS/C-2705 |
1400 (IST) on 19thSeptember, 2007 |
| 210. |
24th
August, 2007 |
Metering Skids (Skid Based Metering Terminals)
Vol. I of II
Vol. II of II
NIT
BEC
05/51/23J8/GAIL/030B |
1500 (IST) on 25thSeptember, 2007 |
|
| -- |
--- |
ADDENDUM :-1
Regarding Tender Document |
05/51/23J8/GAIL/030B |
1500 (IST) on 25thSeptember, 2007 |
| -- |
--- |
Clarifications & Addendum-ii To Tender Document |
05/51/23J8/GAIL/030B |
1500 (IST) on 25thSeptember, 2007 |
| 209. |
24th
August, 2007 |
Payment Of Final Dividend-2006-07 |
ND/GAIL/SECTT/2007 |
1030 (IST) on 30thAugust, 2007 |
| 208. |
24th
August, 2007 |
Annual maintenace
contract of Telecom system and network of LPG PLANT, lakwa guest House, CISF COLONY |
GAIL/LA/C&P/158
/
3300019574/
TELECOM/ASB |
1400 (IST) on 11thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Regarding Tender Document |
GAIL/LA/C&P/158
/
3300019574/
TELECOM/ASB |
1400 (IST) on 18thSeptember, 2007 |
| 207. |
24th
August, 2007 |
Procurement Of
Krik Cells At GAIL , Cherlapally |
GAIL/VIZ/014662/3200035454/SG |
1400 (IST) on 14thSeptember, 2007 |
| 206. |
24th
August, 2007 |
Supply, Installation & Commissioning of Portable Leak Detector at GAIL, Gandhar |
GAIL/GA/2K7031/3200035448/C&P/I/YS/ |
1400 (IST) on 9thOctober, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/GA/2K7031/3200035448/C&P/I/YS/ |
1400 (IST) on 23rdOctober, 2007 |
| -- |
-- |
Corrigendum-II:Regarding Tender Document |
GAIL/GA/2K7031/3200035448/C&P/I/YS/ |
1400 (IST) on 27rdNovember, 2007 |
| 205. |
24th
August, 2007 |
Procurement Of
G I Sheets For Ips Mansarampura, Jaipur |
GAIL/JP/C&P/100/3200035455/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 204. |
24th
August, 2007 |
Calibration Of
Gail Master Equipments |
GAIL/BDA/07/043/3300019585/WS/01 |
1400 (IST) on 7thSeptember, 2007 |
| 203. |
24th
August, 2007 |
Hiring of vehicles on temporary basis for the construction of Receipt Terminal (RT) and Pipeline connectivity between IPS,
Mansarampura & BPCL Bottling Plant at Jaipur |
GAIL/JP/C&P/102/3300019581/07-08 |
1400 (IST) on 7thSeptember, 2007 |
| 202. |
24th
August, 2007 |
Printing Of Agenda Separators |
GAIL/ND/07/0039/
3200035463
/C&P/20014787 |
1400 (IST) on 12thSeptember, 2007 |
| 201. |
24th
August, 2007 |
Hiring Of Vechle
On Call Basis |
GAIL/AG/07/0711/3300019568/JBS/C&P/ |
1400 (IST) on 18thSeptember, 2007 |
| 200. |
24th
August, 2007 |
Procurement Of
Tyre-tubes For Mobile Aams Station Truck |
GAIL/ PA07/14524/3200035442/ANS/Inst |
1500 (IST) on 18thSeptember, 2007 |
| 199. |
23rd
August, 2007 |
Procurement of 75 KVA DEG |
GAIL/HZR/FL-33P/3200035417/AMT |
1400 (IST) on 19thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date
|
GAIL/HZR/FL-33P/3200035417/AMT |
1400 (IST) on 17thOctober, 2007 |
| 198. |
23rd
August, 2007 |
Repair Of Smrs Of Sv-03 Charger
|
GAIL/JA/07/RS16/3300019549/RC/2007-08 |
1400 (IST) on 7thSeptember, 2007 |
| 197. |
23rd
August, 2007 |
Servicing of
C&S make Air Circuit Breakers of LPG/GREP PLANT
|
GAIL/VAG/12013//3300019558/C&P/E/6056RT |
1400 (IST) on 12thSeptember, 2007 |
| 196. |
23rd
August, 2007 |
Laying &
Construction of pipeline for LPG connectitivity at Gandhar to IOCL bottling plants
|
05/51/23KF(GHDR)/GAIL/001(v) |
1500 (IST) on 14thSeptember, 2007 |
| 195. |
23rd
August, 2007 |
Construction of
security cabins at SV/IP stations under samakhiali maintenance base |
GAIL/SA/06/JR52/3300019563/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 194. |
23rd
August, 2007 |
Construction Of
Shed For Lube Oil & Used Pump Spares In Rwtp At Gail, Pata |
GAIL/PATA/C&P/20013284/LK |
1500 (IST) on 14thSeptember, 2007 |
| 193. |
23rd
August, 2007 |
Providing and
fixing of false ceiling in rooms of administrative building at IPS Samakhiali |
GAIL/SA/06/JR61/3300019557/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 192. |
23rd
August, 2007 |
Hydro Testing,
Painting & Refilling Of Co2 Cylinders At Sv Stations No. 8 To 18, Excluding Sv No. 10 & 11 Under Samakhiali
Maintenance Base Dist Kutch (Gujarat) |
GAIL/SA/06/JR53/3300019564/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 191. |
23rd
August, 2007 |
Painting Job At
Dt. And Ht. Kandla. |
GAIL/KA/07/SR07/3300019566/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 190. |
23rd
August, 2007 |
Sv Standardisation
Work Under IPS, Samakhiali |
GAIL/SA/07/SR03/3300019565/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 189. |
23rd
August, 2007 |
SUPPLY OF FLOOD LIGHT FITTINGS (PHILIPS OR EQUIVALENT) AT GAIL'S IPS, MANSARAMPURA, JAIPUR".
|
GAIL/JP/C&P/089/3200035439/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 188. |
23rd
August, 2007 |
Procurement Of
Conveyor Belts For Bagging Lines Of Hdpe & Lldpe Bagging Unit At GAIL; Pata |
GAIL/PA07/20010299/3200035424/SS |
1500 (IST) on 14thSeptember, 2007 |
| 187. |
23rd
August, 2007 |
Procurement Of
Vibration Switch At Gail, Vaghodia |
GAIL/VAG/14746/3200035431/C&P/M/04/07L |
1400 (IST) on 12thSeptember, 2007 |
| 186. |
22nd
August, 2007 |
Providing & Fixing
Of Rain Protection Shed Over Terrace Of Community Hall Building In New Gail Colony At Magdalla, Surat |
GAIL/HZR/FL-35C/3300019526/AMT |
1400 (IST) on 19thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/HZR/FL-35C/3300019526/AMT |
1400 (IST) on 17thOctober, 2007 |
| 185. |
22nd
August, 2007 |
Repairing And
Replacing Of Wooden Cupboard,Wall Panneling And Door Shutter In Technical Building & Mcr At Compressor Station |
GAIL/HZR/FL-36C/3300019534/AMT |
1400 (IST) on 19thSeptember, 2007 |
| 184. |
22nd
August, 2007 |
Laying &
Construction of pipeline for LPG connectitivity at Vijaipur to IOCL bottling plants |
05/51/23KF(VJPR)/GAIL/001 (iv) |
1500 (IST) on 13thSeptember, 2007 |
| -- |
--- |
Addendum-I To Tender Document |
05/51/23KF(VJPR)/GAIL/001 (iv) |
1500 (IST) on 13thSeptember, 2007 |
| -- |
--- |
Addendum-II To Tender Document |
05/51/23KF(VJPR)/GAIL/001 (iv) |
1500 (IST) on 27thSeptember, 2007 |
| -- |
--- |
Addendum-III To Tender Document |
05/51/23KF(VJPR)/GAIL/001 (iv) |
1500 (IST) on 27thSeptember, 2007 |
| 183. |
22nd
August, 2007 |
Supply And
Installation Of 02 Nos. Of 30 Meter High Mast Lighting System |
GAIL/AU07/13390/3200035244/NM |
1500 (IST) on 11thSeptember, 2007 |
| 182. |
22nd
August, 2007 |
Supply Of
Desuperheater Station |
GAIL/PA07/14033/3200035349/NM |
1500 (IST) on 5thOctober, 2007 |
| 181. |
22nd
August, 2007 |
Hydro Testing,
Painting & Refilling Of Co2 And Ht & Painting Of Dcp Fire Extinguishers At Sv Station And Dt Kandla |
GAIL/KA/07/SR04/3300019542/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 180. |
22nd
August, 2007 |
Hydro Testing,
Painting & Refilling of CO2 and HT & Painting of DCP Fire Extinguishers provided at IPS Samakhiali, IP 1 & SV Station No. 08 -18 |
GAIL/SA/07/SR02/3300019524/07-08 |
1400 (IST) on 14thSeptember, 2007 |
| 179. |
22nd
August, 2007 |
Maintenance Services for Electrical/
Mechanical & Instrumentation at terminal & P/L under Jagdishpur |
GAIL/PATA/C&P/20012650/LK |
1500 (IST) on 14thSeptember, 2007 |
| 178. |
22nd
August, 2007 |
Procurement Of Dcp Extinguisher |
GAIL/ABR/07/11/3200035409/014643/SNS |
1400 (IST) on 18thSeptember, 2007 |
| 177. |
22nd
August, 2007 |
Procurement Of
Digital Copier With Printer |
GAIL/US/07/P027/3200035383/FL-051/07-08 |
1400 (IST) on 7thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Extension of bid due date |
GAIL/US/07/P027/3200035383/FL-051/07-08 |
1400 (IST) on 21stSeptember, 2007 |
| 176. |
22nd
August, 2007 |
Supply,
Installation & Commissioning Of Turbine Control System For Stg-2 At Gail, Pata |
GAIL/PATA/C&P/PR 20013433/NM |
1500 (IST) on 25thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/PR 20013433/NM |
1500 (IST) on 25thSeptember, 2007 |
| -- |
-- |
Corrigendum-II:Regarding Tender Document |
GAIL/PATA/C&P/PR 20013433/NM |
1500 (IST) on 22ndDecember, 2007 |
| -- |
-- |
Corrigendum-III:Regarding Tender Document |
GAIL/PATA/C&P/PR 20013433/NM |
1500 (IST) on 15thJanuary, 2007 |
| 175. |
22nd
August, 2007 |
Supply Of Filter Elements At Gail, Vaghodia- India |
GAIL/VAG/C&P/13549/ FILTERS/CWH/MECH/2007 |
1500 (IST) on 26thSeptember, 2007 |
| 174. |
22nd
August, 2007 |
Procurement Of Breathing Appratus At GAIL, Baroda |
GAIL/BDA/07/029/3200035397/ID/04 |
1400 (IST) on 14thSeptember, 2007 |
| 173. |
22nd
August, 2007 |
Procurement Of
Consumables For Pc And Peripherals |
GAIL/VAGH/13208/3200035398/C&P/IT |
1400 (IST) on 19thSeptember, 2007 |
| 172. |
22nd
August, 2007 |
Road Reapir Work
For Gail Vihar Noida |
GAIL/ND/HR-C&P/07/0013 |
1400 (IST) on 18thSeptember, 2007 |
| 171. |
21st
August, 2007 |
Adhesive
Make: Anabond |
GAIL/LAK/SD/28/3200035348/C&P/M/07-08 |
1400 (IST) on 4thSeptember, 2007 |
| 170. |
21st
August, 2007 |
Supply Of Pipeline Current Mapper Receiver For Tripura Pipeline System |
GAIL/AGT/07/02 /3200035365/PKS |
1400 (IST) on 19thSeptember, 2007 |
| 169. |
21st
August, 2007 |
Hiring Of Vehicles
On Call Basis |
GAIL/07/RJ14583/3300019514/VS |
1400 (IST) on 07thSeptember, 2007 |
| 168. |
21st
August, 2007 |
Lighting Accessories |
GAIL/VH/07/M061/3200035334/ELECT |
1400 (IST) on 11thSeptember, 2007 |
| 167. |
21st
August, 2007 |
Procurement Of Heavy
Duty 12 Point Sockets, Extension Bars, Ratchets & Universal Joints For Lpg Plant, Gail Vijaipur |
GAIL/VL/07/M104/3200035363/MECH-LPG |
1400 (IST) on 18thSeptember, 2007 |
| 166. |
21st
August, 2007 |
Procurement Of High
Pressure Manual Hydro Test Pump For Lpg Plant, GAIL Vijaipur |
GAIL/VL/07/M105/3200035320/MECH-LPG |
1400 (IST) on 18thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/VL/07/M105/3200035320/MECH-LPG |
1400 (IST) on 3rdOctober, 2007 |
| 165. |
21st
August, 2007 |
Supply of
ordinary water |
GAIL/NA/07/037 /3200035341/FL-1042 |
1400 (IST) on 21stSeptember, 2007 |
| 164. |
20th
August, 2007 |
Supply Of Disconnection Module |
GAIL/PA07/13068/3200035258/NM |
1500 (IST) on 11thSeptember, 2007 |
| -- |
|
Corrigendum-I:Regarding Tender Document |
GAIL/PA07/13068/3200035258/NM |
1500 (IST) on 11thSeptember, 2007 |
| -- |
|
Annexure-A: Regarding Tender Document |
GAIL/PA07/13068/3200035258/NM |
--- |
| 163. |
20th
August, 2007 |
Annual Maintenance Contract For Calibration & Testing Of Psv/Tsv |
GAIL/PA07/13677/3300019397/NM |
1500 (IST) on 11thSeptember, 2007 |
| 162. |
20th
August, 2007 |
Procurement Of Electrical Cables |
GAIL/KCS/08/017/3200035272/PIPELINE |
1400 (IST) on 14thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/KCS/08/017/3200035272/PIPELINE |
1400 (IST) on 12thOctober, 2007 |
| 161. |
20th
August, 2007 |
Rain Coat |
GAIL/VAGH/10425/3200035299/C&P/F&S |
1400 (IST) on 19thSeptember, 2007 |
| 160. |
20th
August, 2007 |
Sf-6 Circuit
Breaker & Parts |
GAIL/VAG/14628L/3200035309/C&P/E/02/07L |
1400 (IST) on 12thSeptember, 2007 |
| 159. |
20th
August, 2007 |
Houskeeping of
Guest House & Canteen at GAIL, Hazira |
GAIL/HZR/FL-34C/3300019493/AMT |
1400 (IST) on 19thSeptember, 2007 |
| 158. |
20th
August, 2007 |
Safety Shoes |
GAIL/VL/07/MO79/3200035296/F&S |
1400 (IST) on 11thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date
|
GAIL/VL/07/MO79/3200035296/F&S |
1400 (IST) on 25thSeptember, 2007 |
| 157. |
20th
August, 2007 |
Socks-Cotton |
GAIL/VL/07/MO77/3200035288/F&S |
1400 (IST) on 11thSeptember, 2007 |
| 156. |
20th
August, 2007 |
shirt & Pant-100% Cotton |
GAIL/VL/07/MO76/3200035280/F&S |
1400 (IST) on 11thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date
|
GAIL/VL/07/MO76/3200035280/F&S |
1400 (IST) on 25thSeptember, 2007 |
| 155. |
20th
August, 2007 |
Empanelment of Vendors for Backdrop and Banners for GAIL (India) Ltd. |
GAIL/ND/CC/Empanelment of Vendors for
Backdrop and Banners/07 |
1400 (IST) on 27thAugust, 2007 |
| 154. |
20th
August, 2007 |
Annual Maintenance
Contract Of Psv Calibration |
GAIL/LA/C&P/160/3300019462/INST/ASB |
1400 (IST) on 4thSeptember, 2007 |
| 153. |
20th
August, 2007 |
Printing Of Hindi
Magazine "Rajbhasha Godavari" 2007-08 |
GAIL/07/RJ14434/3300019487/ |
1400 (IST) on 5thSeptember, 2007 |
| 152. |
20th
August, 2007 |
Cathodic Protection
Works Of Kg Basin |
GAIL/07/RJ14594/3300019459/VS |
1400 (IST) on 7thSeptember, 2007 |
| 151. |
18th
August, 2007 |
Procurement Of A Class Rtds |
GAIL/AU07/14123/3200035245/NM |
1500 (IST) on 11thSeptember, 2007 |
| 150. |
18th
August, 2007 |
REFILLING OF GAS
EXTINGUSHERS / CYLINDERS (DCP Extg.,
CO2 Extg.& N2 CYLINDERS) ON ARC BASIS |
GAIL/PATA/C&P/PR 20013672/AW |
1500 (IST) on 11thSeptember, 2007 |
| 149. |
18th
August, 2007 |
Supply of Activated
Alumina, Quantity: 1440 MT |
GAIL/PATA/C&P/20011845/SD |
1500 (IST) on 18thSeptember, 2007 |
| 148. |
18th
August, 2007 |
AMC of cooling appliances under Undera maintenance base |
GAIL/BDA/07/038/3300019425/WS/04 |
1400 (IST) on 11thSeptember, 2007 |
| 147. |
18th
August, 2007 |
Safety awareness
survey for GAIL (India) Limited, vijaipur |
GAIL/VL/07/C063/3300019426/F&S |
1400 (IST) on 18thSeptember, 2007 |
| 146. |
18th
August, 2007 |
Procurement Of Accumulator Bladder |
GAIL/US/07/P026/3200035227/FL-055/07-08 |
1400 (IST) on 31stAugust, 2007 |
| -- |
--- |
Corrigendum-I:
Extension of bid due date |
GAIL/US/07/P026/3200035227/FL-055/07-08 |
1400 (IST) on 7thSeptember, 2007 |
| 145. |
18th
August, 2007 |
Procurement Of
Mark III Upgrade Kit At Gail, Baroda |
GAIL/BDA/07/026/3200035252/ID/03 |
1400 (IST) on 11thSeptember, 2007 |
| 144. |
18th
August, 2007 |
Testing Of Transformer
Oil At Jhabua Compressor Station And Township |
GAIL/SR20013791/3300019437/JHA/C-06/07 |
1400 (IST) on 14thSeptember, 2007 |
| 143. |
18th
August, 2007 |
Arc For Vibration
Monitoring And Lube Oil Analysis |
GAIL/LA/C&P/157/3300019438/MECH/ASB/ |
1400 (IST) on 4thSeptember, 2007 |
| -- |
---- |
Corrigendum-I:
Regarding Tender Document |
GAIL/LA/C&P/157/3300019438/MECH/ASB/ |
1400 (IST) on 11thSeptember, 2007 |
| 142. |
17th
August, 2007 |
Supply &
Installation of Lightning Arrestor at GAIL, Gandhar |
GAIL/GA/2K7001/3400000057/C&P/M/YS/ |
1400 (IST) on 4thSeptember, 2007 |
| 141. |
17th
August, 2007 |
Preparation Of 20%
Master Batch Of Md1024 (Metal Deactivator) With Base Resin, Lldpe E36a060 |
GAIL/PATA/C&P/20010131/LK/07 |
1500 (IST) on 7thSeptember, 2007 |
| 140. |
17th
August, 2007 |
Maintenance Contract For Optical Fiber Cable (Ofc) Under Up Region |
GAIL/AUR/GAILTEL/20013288/LK |
1500 (IST) on 4thSeptember, 2007 |
| 139. |
17th
August, 2007 |
Submersibile Pump |
GAIL/VAGH/13170/3200035228/C&P/ELECT |
1400 (IST) on 12thSeptember, 2007 |
| 138. |
17th
August, 2007 |
GAIL Ramgarh Custody Instrumentation |
GAIL/BDA/07/041/3300019404/WS/08 |
1400 (IST) on 24thAugust, 2007 |
| 137. |
17th
August, 2007 |
Services For
Rectification Of "Reviva" Water Filter & Purifier Installed At GAIL, Dahej Terminal |
GAIL/BDA/07/042/3300019405/WS/03 |
1400 (IST) on 24thAugust, 2007 |
| 136. |
17th
August, 2007 |
Auto Attendent For
Alcatel 4400 Epabx Installed At Ahmedabad Zonal Office Of GAIL (INDIA) Limited |
GAIL/BDA/07/039/3300019400/WS/05 |
1400 (IST) on 4thSeptember, 2007 |
| 135. |
17th
August, 2007 |
Repair Of Custody Flow Computer-Ramgarh |
GAIL/BDA/07/040/3300019402/WS/08 |
1400 (IST) on 24thAugust, 2007 |
| 134. |
17th
August, 2007 |
Procurement Of Centrifugal Pump |
GAIL/AG/07/0529/3200035235/JBS/C&P/ |
1400 (IST) on 7thSeptember, 2007 |
| 133. |
17th
August, 2007 |
Procurement Of Lighting Fixture |
GAIL/US/07/P025/3200035218/FL-052/07-08 |
1400 (IST) on 31stAugust, 2007 |
| 132. |
16th
August, 2007 |
Providing Of Security
Care Taking Services At Corporate Office, New Delhi And Gti Noida |
GAIL/SEC/ND/28/2007 |
1500 (IST) on 30thAugust, 2007 |
| 131. |
16th
August, 2007 |
Procurement Of Polyster Thread For Stitching Of Bags At Lldpe & Hdpe Bagging At GAIL Pata |
GAIL/PA07/14429/3200035210/SR (PTD) |
1400 (IST) on 14thSeptember, 2007 |
| 130. |
16th
August, 2007 |
Procurement of Control Valve for LPG Pipeline
Project in Vijaipur & Gandhar>b
Vol. I of II
Vol. II of II
NIT
BEC
05/51/23KF (VIJ-GAN)/GAIL/062 |
1500 (IST) on 6thSeptember, 2007 |
|
| 129. |
16th
August, 2007 |
Structural Stability Certificaties For Lpg /Grep Ntggat Gail, Vaghodia |
GAIL/VAGA/C&P/C/2007033 |
1500 (IST) on 5thSeptember, 2007 |
| 128. |
16th
August, 2007 |
Safety Audit Of
Compressor Station And Terminals Of Gail (India) Limited [Under Vijaipur Jurisdiction] |
GAIL/VH/07/C052/3300019386/F&S |
1400 (IST) on 18thSeptember, 2007 |
| 127. |
16th
August, 2007 |
Reconditioning
Of 125 Kva Alternator |
GAIL/GA/W2K6036/3300019383/C&P/E/S/ |
1400 (IST) on 4thSeptember, 2007 |
| 126. |
16th
August, 2007 |
Accoustic Enclouser |
GAIL/ABR/07/02/3200035187/0013329/SNS |
1400 (IST) on 18thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/ABR/07/02/3200035187/0013329/SNS |
1400 (IST) on 3rdOctober, 2007 |
| 125. |
16th
August, 2007 |
Flow Computer
Make: Bristol Babcock |
GAIL/IMP/07/055/3200035185/ID/05 |
1400 (IST) on 31stAugust, 2007 |
| 124. |
16th
August, 2007 |
Multigas Detector |
GAIL/VAGH/12393/3200035208/C&P/LPG-F&S |
1400 (IST) on 12thSeptember, 2007 |
| 123. |
16th
August, 2007 |
Procurement of
COUPLING FOR TFE for GAIL (India) Ltd., Pata |
GAIL/PA07/12710/3200035186/KN |
1500 (IST) on 4thSeptember, 2007 |
| 122. |
16th
August, 2007 |
Procurement Of Aluminium Block For Cooling Tower Fan Maintenance At Lpg Plant, Vijaipur |
GAIL/VL/07/M097/3200035182/MECH-LPG |
1500 (IST) on 31stAugust, 2007 |
| 121. |
16th
August, 2007 |
Supply Of Di-ethyl
Aluminium Ethoxide (Qty: 12 Mt) |
GAIL/PA07/12409/3200035183/SD |
1500 (IST) on 4thSeptember, 2007 |
| 120. |
16th
August, 2007 |
Procurement of
DUAL LAMINATE CPVC TANK for GAIL (India) Ltd., Pata |
GAIL/PA07/14362/3200035174/KN |
1500 (IST) on 7thSeptember, 2007 |
| 119. |
14th
August, 2007 |
Supply Of
Drying Oven Apparatus With Spares & Accessories |
GAIL/PATA/C&P/PR 20006653/AW |
1500 (IST) on 14thSeptember, 2007 |
| 118. |
14th
August, 2007 |
Procurement Of
Spares For Instromet Flow Computer At Gail, Baroda |
GAIL/BDA/07/025/3200035177/ID/03 |
1400 (IST) on 7thSeptember, 2007 |
| 117. |
14th
August, 2007 |
procurement of water
for kandla |
GAIL/KA/07/PR07/3200035122/RC/2007-08 |
1400 (IST) on 28thAugust, 2007 |
| 116. |
14th
August, 2007 |
Procurement Of
Fluorescent Lamps |
GAIL/VL/07/M101/3200035172/ELECT |
1400 (IST) on 4thSeptember, 2007 |
| 115. |
14th
August, 2007 |
Procurement Of Chemicals |
GAIL/VL/07/M100/3200035157/OPS |
1400 (IST) on 4thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Extension of bid due date |
GAIL/VL/07/M100/3200035157/OPS |
1400 (IST) on 18thSeptember, 2007 |
| 114. |
14th
August, 2007 |
Lube Oil & Ferrography Analysis Of Critical Equipments At Lpg Plant Vijaipur -rate Contract |
GAIL/VL/07/C062/3300019349/MECH |
1400 (IST) on 12thSeptember, 2007 |
| 113. |
14th
August, 2007 |
ARC for
CALIBRATION OF Test Equipments Of P/l Dept & Associated Terminals (NFL,ANTA,
GADEPAN,
SAMCORE,SAMTEL & GWALIOR) for |
GAIL/VH/07/C059/3300019350/PL |
1400 (IST) on 12thSeptember, 2007 |
| 112. |
14th
August, 2007 |
Hiring Of Contract
Services For Replacement Of Discharge Valves & Nrvs Of Lpg Mainline Pumps B & C At Ips-samakhiali |
GAIL/SA/07/1428/3300019366/RC/2007-08 |
1400 (IST) on 24thAugust, 2007 |
| 111. |
14th
August, 2007 |
Procurement Of
Coalescing Oil Filter Element For Oil Mist Eliminator Of Gas Turbines At Lpg Plant, Vijaipur |
GAIL/VL/07/M103/3200035163/MECH-LPG |
1400 (IST) on 11thSeptember, 2007 |
| 110. |
14th
August, 2007 |
Appointment Of
Engineering Consultant For Cold Insulation & Thermal Barrier Over Off Spec Ethylene Sphere (Ts-00-114)-IOP
,Gail, Pata |
GAIL/PA/13300/3300019344/AKR |
1500 (IST) on 14thSeptember, 2007 |
| 109. |
14th
August, 2007 |
Lead Acid
Tabular Cell |
GAIL/PR20013006/3200035138/JHA/002/07 |
1400 (IST) on 7thSeptember, 2007 |
| 108. |
14th
August, 2007 |
Procurement Of
Pipe Fitting Materials For Lpg Maintenance Job |
GAIL/VL/07/M088/3200035130/MECH-LPG |
1400 (IST) on 11thSeptember, 2007 |
| 107. |
14th
August, 2007 |
Procurement Of
Spare T-type Strainer For Feed Gas Chiller Of Lpg Recovery Plant, Vijaipur |
GAIL/VL/07/M086/3200035109/MECH-LPG |
1400 (IST) on 11thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Extension of bid due date |
GAIL/VL/07/M086/3200035109/MECH-LPG |
1400 (IST) on 18thSeptember, 2007 |
| 106. |
14th
August, 2007 |
Procurement Of Ball & Globe Valves>b
Vol. I of II
Vol. II of II
NIT
BEC
05/51/23KF(VIJ-GAN)/GAIL/002 |
1500 (IST) on 3rdSeptember, 2007 |
|
| 105. |
13th
August, 2007 |
Procurement of Valves for Modification Work at HPCL |
GAIL/VIZ/014506/3200035105/SG/ |
1500 (IST) on 4thSeptember, 2007 |
| -- |
-- |
Corrigendum-I: Extension of bid due date |
GAIL/VIZ/014506/3200035105/SG/ |
1500 (IST) on 14thSeptember, 2007 |
| 104. |
13th
August, 2007 |
Procurement Of Mass Flow Meter With Flow Computer
Vol. I of II
Vol. II of II
NIT
BEC
05/51/23KF(VIJ-GAN)/GAIL/058 |
1500 (IST) on 29thAugust, 2007 |
|
| 103. |
13th
August, 2007 |
Preparation of 20% Master Batch of Tinuvin 622 with Base Resin, LLDPE-E-36A060 |
GAIL/PATA/C&P/20010361/LK |
1500 (IST) on 4thSeptember, 2007 |
| 102. |
13th
August, 2007 |
Plant Painting Of Pipes,Equipments And Structures Of Lpg,Ntggplantat Gail Vaghodia |
GAIL/VAG/13931/3300019333/C&P/M/7031/L |
1400 (IST) on 12thSeptember, 2007 |
| 101. |
13th
August, 2007 |
02 years
Horticulture Maintenance work at GAIL Vihar Jaipur |
GAIL/JP/C&P/91/3300019345/07-08 |
1400 (IST) on 31stAugust, 2007 |
| 100. |
13th
August, 2007 |
Procurement Of
Tsv At Gail , Cherlapally |
GAIL/VIZ/014452/3200035085/SG/ |
1400 (IST) on 4thSeptember, 2007 |
| 100. |
13th
August, 2007 |
Spares Parts
For Pcv Pietro Make |
GAIL/IMP/07/054/3200035077/ID/05 |
1400 (IST) on 31stAugust, 2007 |
| 99. |
13th
August, 2007 |
Procurement of TROLLEY MOUNTED OIL PURIFIER for GAIL (India) Ltd., Pata |
GAIL/PA07/14164/3200035093/KN |
1500 (IST) on 4thSeptember, 2007 |
| 98. |
13th
August, 2007 |
Procurement Of
Pressure & Dp Switches For Lpg-plant At Gail (India) Limited, Vijaipur |
GAIL/VL/07/M085/3200035104/INST |
1400 (IST) on 11thSeptember, 2007 |
| 97. |
13th
August, 2007 |
Pigging Activty
At Undera Base Station Pipeline Section Undera - GIPCL Terminal 12 Inch Dia 6.2 KM |
GAIL/BDA/07/027/3400000050/IDWS/04 |
1400 (IST) on 11thSeptember, 2007 |
| 96. |
13th
August, 2007 |
Population
Density Index Survey Of Vijaipur - Dadri (Grep) Pipeline |
GAIL/ND/C&P/PROJ/S&LR/GREP/07-24/02 |
1400 (IST) on 28thAugust, 2007 |
| 95. |
13th
August, 2007 |
Procurement Of
Calibration Gas At Gail, Baroda |
GAIL/BDA/07/028/3200035083/ID/03 |
1400 (IST) on 4thSeptember, 2007 |
| 94. |
11th
August, 2007 |
Replacement
of Power Cable CCVT at RR Stations under Hazira Region |
GAIL/HZR/FL-33C/3300019321/AMT |
1400 (IST) on 12thSeptember, 2007 |
| 93. |
11th
August, 2007 |
Procurement Of
Structural Material For Lpg Maintenance Jobs |
GAIL/VL/07/M087/3200035061/MECH-LPG |
1400 (IST) on 4thSeptember, 2007 |
| 92. |
11th
August, 2007 |
Procurement Of Puf
Supports For Expansion And Chilling Loops At Lpg Plant, Gail Vijaipur |
GAIL/VL/07/M096/3200035069/MECH-LPG |
1400 (IST) on 4thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:
Extension of bid due date |
GAIL/VL/07/M096/3200035069/MECH-LPG |
1400 (IST) on 18thSeptember, 2007 |
| 91. |
11th
August, 2007 |
Procurement Of Asbestos
Free Fibre Jointing Sheets At Hvj-dvpl Compressor Station |
GAIL/VH/07/M062/3200035062/MECH-HVJ |
1400 (IST) on 5thSeptember, 2007 |
| 90. |
10th
August, 2007 |
Re-routing Of
8" Nb X 5 Km And 4" Nb X 6 Km Pipeline Project At Firozabad |
05/51/23KG/GAIL/001 |
1500 (IST) on 31stAugust, 2007 |
| -- |
--- |
Addendum-I:
Regarding Tender Document |
05/51/23KG/GAIL/001 |
1500 (IST) on 31stAugust, 2007 |
| 89. |
10th
August, 2007 |
Procurement Of
Shaft Seal For Hvac System |
GAIL/HZR/FL-27P/3200035042/AMT |
1400 (IST) on 12thSeptember, 2007 |
| 88. |
10th
August, 2007 |
Procurement Of
Lab Reagents For Hospital |
GAIL/PA07/14273/3200035037/SR(MEDICAL) |
1400 (IST) on 4thSeptember, 2007 |
| 87. |
10th
August, 2007 |
Servicing Of 33kv,
Fb4/Gmh, Sh6, Draw Out Type Voltas Make Circuit Breaker |
GAIL/SR20013739/3300019320/JHA/C-005/07 |
1400 (IST) on 7thSeptember, 2007 |
| -- |
-- |
Amendment - I:
Regarding Tender Document |
GAIL/SR20013739/3300019320/JHA/C-005/07 |
1400 (IST) on 7thSeptember, 2007 |
| 86. |
10th
August, 2007 |
Procurement of Tube
Bundle For Reboiler For GAIL (India) Ltd., Pata |
GAIL/PA07/14320/3200035038/KN |
1400 (IST) on 31stAugust, 2007 |
| 85. |
10thA
ugust, 2007 |
Mechanical Consumables |
GAIL/GA/2K7036/3200035036/C&P/M/YS/ |
1400 (IST) on 27thAugust, 2007 |
| 84. |
9th
August, 2007 |
Lab Chemicals |
GAIL/LAK/SD/10R/3200034965/C&P/LB/07-08 |
1400 (IST) on 28thAugust, 2007 |
| 83. |
9th
August, 2007 |
Energy Audit At Gail Compressor Station, Hazira |
GAIL/HZR/FL-22C/3300019263/AMT |
1400 (IST) on 12thSeptember, 2007 |
| 82. |
9th
August, 2007 |
Laying & Construction
Of 18" Dia. Pipeline Terminals And Associated Facilities For Odjp- Kcjp & Odjp-kjp Loopline And Ril Connectivity
Alongwith Additional / Residual Jobs In Kg Basin For GAIL |
05/51/23J8(Part C - RIL)/GAIL/001A |
1500 (IST) on 11thSeptember, 2007 |
| -- |
--- |
Addendum-I To Tender Document |
05/51/23J8(Part C - RIL)/GAIL/001A |
1500 (IST) on 11thSeptember, 2007 |
| 81. |
9th
August, 2007 |
Comprehensive
Annual Maint. Contract For Windoe/Split Ac's & Water Cooler Installed At Khear,Ujjain,Indore |
GAIL/KCS/07/C06/3300019291/Electrical |
1400 (IST) on 31stAugust, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/KCS/07/C06/3300019291/Electrical |
1400 (IST) on 25thSeptember, 2007 |
| 80. |
9th
August, 2007 |
Procurement of ARGON-HELIUM MISTURE for GAIL (India) Ltd., Pata |
GAIL/PA07/14562/3200035019/KN |
1500 (IST) on 24thAugust, 2007 |
| 79. |
9th
August, 2007 |
Service Contract For
Internal Handling & Truck Loading Of Pressurized Liquid Like Lpg And Mfo |
GAIL/VAG/13966/3300019272/C&P/OP7036L |
1400 (IST) on 12thSeptember, 2007 |
| 78. |
9th
August, 2007 |
Locall Control Stations |
GAIL/VAG/11986/3200034995/C&P/CWH/ELE |
1400 (IST) on 5thSeptember, 2007 |
| 77. |
9th
August, 2007 |
Stationery items at GAIL, VIZAG |
GAIL/VIZ/014586/3200035001/SG |
1400 (IST) on 21stAugust, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/VIZ/014586/3200035001/SG |
1400 (IST) on 21stAugust, 2007 |
| 76. |
9th
August, 2007 |
Procurement Of House keeping meterial at GAIL |
GAIL/PY/07/4270/3200035015/2007007 |
1400 (IST) on 29thAugust, 2007 |
| 75. |
9th
August, 2007 |
Overhauling , Calibration/Testing of Pressure Safety Valves(PSV"s) at GAIL-Dahej , Ankot and Samni terminals |
GAIL/BDA/07/036/3300019262/WS/03 |
1400 (IST) on 31stAugust, 2007 |
| 74. |
9th
August, 2007 |
Procurement Of
Battery |
GAIL/AG/07/0528/3200034977/JBS/C&P/ |
1400 (IST) on 7thSeptember, 2007 |
| 73. |
8th
August, 2007 |
Procurement Of
Kpcl Make Model Ac1270 Compressor In Mcc-hvac Building At Hvj-dvpl Compressor Station |
GAIL/VH/07/M059/3200034937/MECH-HVJ |
1400 (IST) on 29thAugust, 2007 |
| 72. |
8th
August, 2007 |
Procurement Of Ro Membrane |
GAIL/ABR/07/09 /3200034947/014542/SNS |
1400 (IST) on 14thAugust, 2007 |
| 71. |
8th
August, 2007 |
Renewal of AMC for Undera Xerox machine |
GAIL/BDA/07/035/3300019252/WS/04 |
1400 (IST) on 14thAugust, 2007 |
| 70. |
8th
August, 2007 |
Carrying Out Risk & Consequences Analysis For Jhabua Compressor Station |
GAIL/SR20014363/3300019251/JHA/C-09/07 |
1400 (IST) on 24thAugust, 2007 |
| 69. |
8th
August, 2007 |
Media Monitoring
Services for GAIL |
GAIL/ND/MKT-C&P/PC-MKTG/CC /05/2007 |
1400 (IST) on 23thAugust, 2007 |
| -- |
--- |
Corrigendum-I:
Regarding Tender Document |
GAIL/ND/MKT-C&P/PC-MKTG/CC /05/2007 |
1400 (IST) on 23thAugust, 2007 |
| 68. |
8th
August, 2007 |
Disposal Of Broken Fixed Furniture, Movable Furniture, Misc. Office Equipment |
GAIL/NOIDA/HR/DISPOSAL/01/2007-2008 |
1400 (IST) on 29thAugust, 2007 |
| 67. |
7th
August, 2007 |
Procurement Of Ball Valve for "Creation of Inventory">b
Vol. I of II
Vol. II of II
05/51/23KF(Inventory Creation)/GAIL/002 |
1500 (IST) on 29thAugust, 2007 |
|
| 66. |
7th
August, 2007 |
Intracity Courier
Services in Mumbai |
GAIL/MU/07/C012/3300019243/ |
1400 (IST) on 11thSeptember, 2007 |
| 65. |
7th
August, 2007 |
Procurement Of
File Cover At GAIL, Baroda |
GAIL/BDA/07/023/3200034868/ID/01 |
1400 (IST) on 31stAugust, 2007 |
| 64. |
7th
August, 2007 |
Supply Of Intake
Air Filter Element For GTC At GAIL, Vaghodia |
GAIL/VH/07/I050/3200034900/MECH |
1400 (IST) on 5thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Extension of bid due date |
GAIL/VH/07/I050/3200034900/MECH |
1400 (IST) on 19thSeptember, 2007 |
| 63. |
7th
August, 2007 |
Amc For 13 Nos.
Xerox Make Photocopiers |
GAIL/PA/07/20013853/LK |
1500 (IST) on 29thAugust, 2007 |
| -- |
-- |
Corrigendum-I:
Regarding Tender Document |
GAIL/PA/07/20013853/LK |
1500 (IST) on 29thAugust, 2007 |
| -- |
-- |
Corrigendum-II:
Regarding Tender Document |
GAIL/PA/07/20013853/LK |
1500 (IST) on 11thSeptember, 2007 |
| -- |
-- |
Corrigendum-III:
Regarding Tender Document |
GAIL/PA/07/20013853/LK |
1500 (IST) on 28thSeptember, 2007 |
| -- |
-- |
Corrigendum-IV:
Regarding Tender Document |
GAIL/PA/07/20013853/LK |
1500 (IST) on 18thOctober, 2007 |
| 62. |
7th
August, 2007 |
Procurement of Consumable Lighting at vaghodia |
GAIL/VAGH/12154/3200034910/C&P/ELCPR/ |
1400 (IST) on 11thSeptember, 2007 |
| 61. |
7th
August, 2007 |
Spares For Lighting |
GAIL/VH/07/M060/3200034925/ELECT |
1400 (IST) on 29thAugust, 2007 |
| 60. |
7th
August, 2007 |
Nut, Bolt And Washers |
GAIL/VL/07/M090/3200034935/ELECT |
1400 (IST) on 29thAugust, 2007 |
| 59. |
7th
August, 2007 |
Battery at GAIL, Vizag |
GAIL/VIZ/014173/3200034890/SG/ |
1400 (IST) on 28thAugust, 2007 |
| 58. |
7th
August, 2007 |
Procurement Of SDH Equipment |
GAIL/ND/MKT-C&P/GAILTEL/07/2007 |
1400 (IST) on 23rdAugust, 2007 |
| 57. |
7th
August, 2007 |
Procurement Of Pre Pad Filter Elements For Ventilation System Of Solar Gas Turbine At Dvpl, Vijaipur |
GAIL/VH/07/M058/3200034869/MECH-HVJ |
1400 (IST) on 29thAugust, 2007 |
| -- |
--- |
Corrigendum-I:Regarding Tender Document |
GAIL/VH/07/M058/3200034869/MECH-HVJ |
1400 (IST) on 12thSeptember, 2007 |
| 56. |
7th
August, 2007 |
Supply, Installation
And Commissioning Of Base Station Of Motorola Gm 338 Vhfat Gail Vaghodia |
GAIL/VAG/14124/3200034872/C&P/T/S/01LT |
1400 (IST) on 29thAugust, 2007 |
| -- |
--- |
Extension Of Closing Date |
GAIL/VAG/14124/3200034872/C&P/T/S/01LT |
1400 (IST) on 12thSeptember, 2007 |
| 55. |
7th
August, 2007 |
Supply of
printed stationery |
GAIL/ND/07/0025/
3300019072/C&P/20014297 |
1400 (IST) on 30thAugust, 2007 |
| 54. |
7th
August, 2007 |
Procurement Of Flow Tees for "Creation of Inventory">b
Vol. I of II
Vol. II of II
05/51/23KF(Inventory Creation)/GAIL/011 |
1500 (IST) on 29thAugust, 2007 |
|
| 53. |
6th
August, 2007 |
Procurement Of Insulating Joints for "Creation of Inventory"
Vol. I of II
Vol. II of II
05/51/23KF(Inventory Creation)/GAIL/009 |
1500 (IST) on 27thAugust, 2007 |
|
| 52. |
6th
August, 2007 |
Supply, Erection,
Testing And Commissioning Of 22kv /0.43kv, 63kva Transformer On Two Pole Structure Including Supply Of
All Materials At Ip4, Vill. Borle, Near Panvel Navi Mumbai |
GAIL/BLR/C&P/DUPL/2007-2008/C-01 |
1400 (IST) on 28thAugust, 2007 |
| -- |
--- |
Corrigendum-I:Extension of bid due date |
GAIL/BLR/C&P/DUPL/2007-2008/C-01 |
1400 (IST) on 18thSeptember, 2007 |
| -- |
--- |
Corrigendum-II:Regarding Tender Document |
GAIL/BLR/C&P/DUPL/2007-2008/C-01 |
1400 (IST) on 18thSeptember, 2007 |
| 50. |
6th
August, 2007 |
Procurement Of
Gaskets For Heat Exchanger for GAIL (India) Ltd., Pata |
GAIL/PA07/14236/3200034830/KN |
1500 (IST) on 24thAugust, 2007 |
| 49. |
6th
August, 2007 |
Supply And Laying
Of Fuel Gas Pipeline |
GAIL/HZR/FL-31C/3300019228/AMT |
1400 (IST) on 5thSeptember, 2007 |
| 48. |
6th
August, 2007 |
Procurement of Tea Vending Mavchine |
GAIL/HZR/FL-31P/3200034843/AMT |
1400 (IST) on 5thSeptember, 2007 |
| 47. |
6th
August, 2007 |
Procurement of
Mechanical consumables |
GAIL/HZR/FL-32P/3200034836/AMT |
1400 (IST) on 5thSeptember, 2007 |
| 46. |
6th
August, 2007 |
Transportation of
apprx. 3000 MT of Cyclohexane from M/s. GSFC, Vadodara to GAIL, PATA (U.P.) in Road Tankers |
GAIL/PA07/14115/3300019224/SD |
1400 (IST) on 21stAugust, 2007 |
| 45. |
6th
August, 2007 |
Service Contract For Collection And Distribution Of Internal Dak At Gail Pata |
GAIL/PATA/C&P/PSER/20013654/SR (HR) |
1500 (IST) on 24thAugust, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/PSER/20013654/SR (HR) |
1500 (IST) on 7thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/PSER/20013654/SR (HR) |
1500 (IST) on 28thSeptember, 2007 |
| 44. |
6th
August, 2007 |
Supply Of Cab-2 Catalyst |
GAIL/PA07/12568/3200034835/SD |
1500 (IST) on 21stAugust, 2007 |
| 43. |
6th
August, 2007 |
Procurement Of
Electrical Consumables |
GAIL/KCS/08/013/3200034857/Electrical |
1400 (IST) on 28thAugust, 2007 |
| 42. |
6th
August, 2007 |
Maintenance Of
Lawn And Plantation At Ips, Nasirabad, Rt, Tabiji,And Gail Township, Ajmer |
GAIL/NA/07/033/3300019218/FL-1037 |
1400 (IST) on 21stAugust, 2007 |
| -- |
---- |
Corrigendum-I:
Extension of bid due date |
GAIL/NA/07/033/3300019218/FL-1037 |
1400 (IST) on 21stSeptember, 2007 |
| 41. |
6th
August, 2007 |
Fabrication,Erection & Commissioning of Acoustic Enclosures for ONE 1350 KVA & ONE 100 KVA DEG set installed at Intermediate Pumping Station, Nasirabad, Ajmer (Rajasthan) |
GAIL/NA/07/027/3300019229/FL-1031 |
1400 (IST) on 21stAugust, 2007 |
| 40. |
6th
August, 2007 |
Supply Of Cyclohexane
(1000 Mt) |
GAIL/PATA/C&P/20012553/SD |
1500 (IST) on 4thSeptember, 2007 |
| -- |
--- |
Corrigendum-I:Regarding Tender Document |
GAIL/PATA/C&P/20012553/SD |
1500 (IST) on 4thSeptember, 2007 |
| 39. |
4th
August, 2007 |
Annual Rate Contract Of Mechanical Maintenance Department |
GAIL/HZR/FL-30C/3300019158/AMT |
1400 (IST) on 5thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/HZR/FL-30C/3300019158/AMT |
1400 (IST) on 10thOctober, 2007 |
| 38. |
4th
August, 2007 |
Lifting Of Grep
Control Panels |
GAIL/HZR/FL-29C/3300019151/AMT |
1400 (IST) on 5thSeptember, 2007 |
| -- |
-- |
Corrigendum-I:Extension of bid due date |
GAIL/HZR/FL-29C/3300019151/AMT |
1400 (IST) on 10thoctober, 2007 |
| 37. |
4th
August, 2007 |
Supply , Upkeep And
Maintinence Of Potted Plant At Gti Noida |
GAIL/GTI/C&P/2K07-025/2007 |
1400 (IST) on 23thAugust, 2007 |
| 36. |
4th
August, 2007 |
Annual Rate
Contract For Occupational Health Check-up Of Gail Employees At Gail Pata & Compressor Station For
The Year 2007 - 2008 |
GAIL/PATA/C&P/PSER/20013979/14012/SR (MEDICAL) |
1500 (IST) on 24thAugust, 2007 |
| 35. |
4th
August, 2007 |
Materials Handling
Contract for Stores, Warehouse and Pipe Yard Maintenance for C&P Department at GAIL, Vizag |
GAIL/VIZ/014449/3300019194/ |
1400 (IST) on 21stAugust, 2007 |
| 34. |
4th
August, 2007 |
Procurement Of Modi Xexox Machine Consumables |
GAIL/ABR/07/M5/3200034800/014383/SNS |
1400 (IST) on 18thAugust, 2007 |
| 33. |
4th
August, 2007 |
Consumable Items For Hospital |
GAIL/VH/07/M057/3200034829/MEDICAL |
1400 (IST) on 21stAugust, 2007 |
| 32. |
4th
August, 2007 |
Consultancy
Services For Structural Stability Certification Of Plant Buildings Including Lpg Unit Area, Ntgg Structures
And Grep Sheds |
GAIL/VAG/14160/3300019148/C&P/C/7033/L |
1400 (IST) on 22ndAugust, 2007 |
| 31. |
4th
August, 2007 |
Testing & Repairing
Of Defective Control Cards Of Thermo-electric Generator, Installed At Jamnagar-loni Lpg Pipeline Under Different |
GAIL/NA/07/031/3300019192/FL-1035 |
1400 (IST) on 21stAugust, 2007 |
| 30. |
4th
August, 2007 |
Testing & Repairing Of Defective Heat Sink Of Thermo-electric Generator, Installed At Underagar-loni Lpg Pipeline Under Different |
GAIL/NA/07/032/3300019184/FL-1036 |
1400 (IST) on 21stAugust, 2007 |
| 29. |
4th
August, 2007 |
Repairing Of Roads At Sv Stations Under Ips Nasirabad |
GAIL/NA/07/024/3300019176/FL-1029 |
1400 (IST) on 21stAugust, 2007 |
| 28. |
4th
August, 2007 |
Supply of Cables |
GAIL/NA/07/030 /3200034796/FL-1034 |
1400 (IST) on 21stAugust, 2007 |
| 27. |
4th
August, 2007 |
Procurement of belt & pulley |
GAIL/VAGH/13581/3200034798/C&P/ME/CPR |
1400 (IST) on 4thSeptember, 2007 |
| 26. |
4thAugust, 2007 |
Procurement Of Batteries |
GAIL/VAGH/13803/3200034815/C&P/ELECT |
1400 (IST) on 5thSeptember, 2007 |
| 25. |
3rd
August, 2007 |
Procurement Of Gaskets |
GAIL/JA/07/RM09/3200034763/RC/2007-08 |
1400 (IST) on 24thAugust, 2007 |
| -- |
--- |
Corrigendum-I:
Extension of bid due date |
GAIL/JA/07/RM09/3200034763/RC/2007-08 |
1400 (IST) on 11thSeptember, 2007 |
| 24. |
3rd
August, 2007 |
Procurement Of
Photocopier Paper And Letter Head |
GAIL/JA/07/RM10/3200034771/RC/2007-08 |
1400 (IST) on 24thAugust, 2007 |
| 23. |
3rd
August, 2007 |
Industrial Gases |
GAIL/VL/07/M083/3200034779/LPG-STORES |
1400 (IST) on 21stAugust, 2007 |
| 22. |
3rdAugust, 2007 |
Process Chemicals
Cation Exchange Resin |
GAIL/VL/07/M094/3200034785/OPS |
1400 (IST) on 21stAugust, 2007 |
| 21. |
3rd
August, 2007 |
Hiring Of
Structural & Architectural Consultancy Services For Construction Of Office And Hall Above Existing Technical
Building At Compressor Station At Hazira |
GAIL/HZR/FL-28C/3300019125/AMT |
1400 (IST) on 5thSeptember, 2007 |
| 20. |
3rd
August, 2007 |
Procurement of Electro Chlorination System |
GAIL/HZR/FL-26P/3200034726/AMT |
1400 (IST) on 29thAugust, 2007 |
| 19. |
3rd
August, 2007 |
Hiring Of Non Ac/Ac Tataindicab For A Period Of 2 Years For Hyderabad Zonal Office |
GAIL/07/RJ14331/3300019147/VS |
1400 (IST) on 20thAugust, 2007 |
| 18. |
3rd
August, 2007 |
Providing Of
Material Handling Services At Gpu, Gail (India) Ltd., Gandhar |
GAIL/GA/W2K7012/3300019140/C&P/YS/ |
1400 (IST) on 21stAugust, 2007 |
| 17. |
3rd
August, 2007 |
Testing, Fault Finding
& Fault Removing Of "Statcon" Float Cum Boost Charger At Intermediate Pumping Station, Nasirabad-ajmer |
GAIL/NA/07/029/3300019124/FL-1033 |
1500 (IST) on 21stAugust, 2007 |
| 16. |
3rd
August, 2007 |
Procurement of
fans.' at GAIL Pata |
GAIL/PA07/12945/3200034754/SKD |
1500 (IST) on 21stAugust, 2007 |
| 15. |
2ndAugust, 2007 |
Procurement Of Portable Grinding Machine |
GAIL/AUR/13902/3200034723/NM |
1500 (IST) on 21stAugust, 2007 |
| 14. |
2nd
August, 2007 |
Procurement Of Bearings |
GAIL/HZR/FL-30P/3200034736/AMT |
1400 (IST) on 29thAugust, 2007 |
| 13. |
2nd
August, 2007 |
Arc For Refilling
Of Nitrogen & Co2 Cylinders Cartridge |
GAIL/VAGH/13286/3200034744/C&P/F&S |
1400 (IST) on 5thSeptember, 2007 |
| 12. |
2nd
August, 2007 |
Hiring of One no
of TATA Sumo for GAIL, Ujjain & One no of TATA Sumo for GAIL, Pithampur |
GAIL/KCS/08/C07/3300019085/HR Services |
1400 (IST) on 21stAugust, 2007 |
| 11. |
2nd
August, 2007 |
Application of Non
Toxic Bird deterrent gel against bird menace at IPS-Nasirabad |
GAIL/NA/07/028/3300019115/FL-1030 |
1400 (IST) on 21stAugust, 2007 |
| 10. |
2nd
August, 2007 |
Smooth running of HVJ RR Stations' ORMAT CCVTs |
GAIL/IMP/07/053/3300019087/WS/04 |
1400 (IST) on 30thAugust, 2007 |
| -- |
-- |
Purchase order |
GAIL/IMP/07/053/3300019087/WS/04 |
|
| 9. |
2nd
August, 2007 |
House Keeping Services
at GAIL (India) Limited G.Konduru, Vijayawada |
GAIL/VSVJ/7SR02/3300019108/ |
1400 (IST) on 24thAugust, 2007 |
| 8. |
1st
August, 2007 |
Procurement Of Mass Flow Meter With Flow
Computer For Lpg Supply For Jamnagar Project
Vol. I of II
Vol. II of II
BEC
05/51/23KF(EOL)/GAIL/058 |
1500 (IST) on 17thAugust, 2007 |
|
| 7. |
1st
August, 2007 |
Supply Of Gas Chromatograph |
GAIL/PATA/C&P/PR 20014256/AW |
1500 (IST) on 31stAugust, 2007 |
| 6. |
1st
August, 2007 |
Procurement of Motors.' at GAIL Pata |
GAIL/PA07/13877/3200034710/SKD |
1500 (IST) on 17thAugust, 2007 |
| 5. |
1st
August, 2007 |
Air Line Trolley |
GAIL/VL/07/M084/3200034709/F&S |
1400 (IST) on 21stAugust, 2007 |
| 4. |
1st
August, 2007 |
supply of Lighting
Spares at GAIL, Nasirabad |
GAIL/NA/07/028 /3200034721/FL-1032 |
1400 (IST) on 21stAugust, 2007 |
| 3. |
1st
August, 2007 |
Hiring Of Vechicle On
Annual Rate Contract Basis |
GAIL/GTI/C&P/2K07-020/2007 |
1400 (IST) on 21stAugust, 2007 |
| 2. |
1st
August, 2007 |
Printing Of Office
Formats & Registers For Gail Vijayawada |
GAIL/VSVJ/7PR09/3200034694/ |
1400 (IST) on 24thAugust, 2007 |
| 1. |
1st
August, 2007 |
Procurement Of Gps
Based Cp Current Interrupter Timer On Buy-back Basis For Gail, Vijayawada
|
GAIL/VSVJ/7PR08/3200034688/ |
1400 (IST) on 24thAugust, 2007 |